Unknown tender

Track Stabilisation (mini-piling) Lisduff

Details

Topic
Engineering works and construction works
Published
11 November 2021
Source
eu:ted

Tender description

Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH. The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable. Lot 1: Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH. The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable. Lot 1: Iarnród Éireann (IÉ) has a requirement for a Civil/Structural Engineering contractor to carry out piling works along a section of track on the Dublin-Cork line. The location of the site is between 71mls 1735yds and 72mls 1560yds at Lisduff, Co. Tipperary This section of track is double line which serves passenger services between Dublin (Heuston Station) and Cork (Kent Station). The traffic along the section has a max speed of 90MPH. The track bed has a soft peat formation which has resulted in problems with both vertical and horizontal track alignment. As a result of the poor track bed formation, a permanent 80mph speed restriction has been imposed on this stretch of 100mph line. Frequent tamping intervention is also required at this location to ensure that the track bed remains stable.

Timeline

  1. Completed: Tender published11 November 2021
    Current notice

About the buyer

Iarnród Eireann-Irish Rail is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45220000 · Engineering works and construction works
  • 45234100 · Railway construction works

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

14 similar open tenders

See more open tenders related to Track Stabilisation (mini-piling) Lisduff.

Explore all open tenders

Related topics

Topics related to Track Stabilisation (mini-piling) Lisduff, ranked by notice volume.

View all topics

Related buyers

Buyers similar to Iarnród Eireann-Irish Rail.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.