EKFB JV - Installation of de-watering system (filter drains) at Greatworth Green Tunnel
Details
- Value
- GBP 1
- Topic
- Drainage pipes
- Published
- 20 October 2021
- Submission
- 1 November 2021
- Source
- uk:contracts_finder
Tender description
EKFB are looking for a competent contractor to install filter drains as part of the dewatering system within the temporary cutting for the Greatworth Green Tunnel. The scope of works includes, but is not limited to: • Installation of approximately 11,000m of 100mm in diameter perforated pipe at 3m to 4m depth and connect it to well point pumps. • All works have to be done in a way to avoid people-plant interface as well as working within the trench. • The works will not be continuous as the drainage works will have to be done in stages, following the Earthworks operations being undertaken. Timeline Start Date - March 2022 Location of the Works: G2S, Greatworth Green Tunnel, ch:101+978 to 104+838 Through this expression of interest you vetted in accordance with the EKFB prequalification model - for further information visit https://www.competefor.com/EiffageKier/ Upon successful shortlisting you will be invited to tender from the EKFB eSourcing platform Market Dojo EKFB will be using a balanced scorecard approach to its procurement activities - for further information visit the above website Kerry Albrighton - Senior Buyer
Timeline
- Completed: Tender published20 October 2021Current notice
- Completed: Submission date1 November 2021
About the buyer
High Speed Two (HS2) Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 44163110 · Drainage pipes
- 44163112 · Drainage system
- 45111240 · Ground-drainage work
- 45232450 · Drainage construction works
- 45232451 · Drainage and surface works
- 45232452 · Drainage works
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@high-speed-two-hs2-ltd.gov |
26 similar open tenders
See more open tenders related to EKFB JV - Installation of de-watering system (filter drains) at Greatworth Green Tunnel.
- Open tender
Repairs and Maintenance DPS
- Open tender
Repairs and Maintenance DPS
- Open tender
Repairs and Maintenance DPS
Related topics
Topics related to EKFB JV - Installation of de-watering system (filter drains) at Greatworth Green Tunnel, ranked by notice volume.
- 8,426£973.7bn
Related buyers
Buyers similar to High Speed Two (HS2) Ltd.
- 2,564£1.6bn
- 865£19.4bn
- 663£8.7bn
- 446£15.4bn
- 416£3.8bn
- 327£19.7m
- 272£362.7m
- 251£232.5m
- 241£570.2m
- 230£10.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.