Environmental Planning for Nuclear Decommissioning at Hartlepool, Heysham 1 and Dungeness B Power Station
Details
- Buyer
- E D F Energy
- Value
- GBP 4,200,000
- Topic
- Environmental Impact Assessment (EIA) services for construction
- Published
- 17 September 2021
- Submission
- 23 September 2021
- Source
- uk:contracts_finder
Tender description
The provision of professional services to prepare and submit planning applications, as well as other supporting assessments and documents, for the new waste management facilities at Heysham 1 Power Station. The scope of professional services also includes the preparation of an environmental statement for the decommissioning project under the Environmental Impact Assessment for Decommissioning Regulations (EIADR). A summary of the key scope elements requirements of this Service is comprised of the following key elements set out below: Planning: Planning permission is required from each relevant Local Planning Authority (LPA) under the TCPA to enable the construction and commission of each of the three waste management facilities. As part of this, planning advice on the scope of civil works, preparation of the planning application (including the planning statement and design and access statements), support during the application determination and post determination in discharging planning conditions will be required. Consultation and Engagement: Support is required in consultation and event management to support both TCPA and EIADR applications, including preparing consultation material, online and virtual engagement platforms, and data management in accordance with the General Data Protection Regulation requirements. The preparation of Consultation Plans and Consultation Reports is also required. Environmental Impact Assessment (EIA): The potential environmental impacts of the decommissioning work has to be assessed through the EIA process, with appropriate Environmental Statements (ES) being submitted with each application for permission, as required by the TCPA EIA Regulations and the EIADR. Marine Licence Applications: Some civil works associated with the waste management facilities and decommissioning works in the marine environment may also require a Marine Licence under the Marine and Coastal Access Act.
Timeline
- Completed: Tender published17 September 2021Current notice
- Completed: Submission date23 September 2021
About the buyer
E D F Energy is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71313440 · Environmental Impact Assessment (EIA) services for construction
- 79416200 · Public relations consultancy services
- 90711400 · Environmental Impact Assessment (EIA) services other than for construction
- 90712000 · Environmental planning
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@e-d-f-energy.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@e-d-f-energy.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@e-d-f-energy.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@e-d-f-energy.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@e-d-f-energy.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@e-d-f-energy.gov |
19 similar open tenders
See more open tenders related to Environmental Planning for Nuclear Decommissioning at Hartlepool, Heysham 1 and Dungeness B Power Station.
- Open tender
Management Consultancy Dynamic Market
- Open tender
Professional Consultancy Services DPS
Related buyers
Buyers similar to E D F Energy.
- 2,594£1.6bn
- 1,683£204.6bn
- 1,499£58.1bn
- 1,016£964.6m
- 938£2.2bn
- 880£19.4bn
- 876£688.0m
- 818£1.7bn
- 760£14.1bn
- 732£153.0m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
