Awarded contract

Electric Plant Storage

Details

Topic
Storage and warehousing services
Published
16 September 2021

Tender description

Electrical plant to be used on substation replacement projects needs to be temporarily stored following delivery from the manufacturer prior to installation. The requirement is for the safe and secure storage of all plant items in an undercover facility (warehouse). Storage, handling and movement of plant within the warehouse facility must meet Northern Powergrid’s safety requirements for both the equipment and staff. The warehouse facility must be secure and must as a minimum feature 24 hour CCTV, a monitored alarm system and access control. A strict stock control system must be implemented and managed. Movement of the equipment within the unit and the loading/unloading of the equipment will be the responsibility of the warehouse facility. Ideally two storage facilities are required, one to service the Yorkshire licence area and one to service to Northeast licence area. The facilities must be easily accessible and centrally located and ideally situated close to the A1, A19, M1 or M62 motorway corridors. Each facility must have a floor storage space of approx. 500m2 and have sufficient space for HGV’s to safety manoeuvre when delivering or picking up plant items. The plant must be stored such that access to all items is possible without the need to manoeuvre items; this is required to gain access for inspection and testing purposes. Some of the electrical plant items will contain oil, hence adequate precautions must be in place to prevent any environmental contamination. The facility must, as a minimum, have spill kits and temporary bunds available at all times and all staff must be adequately trained to deal with oil spillage/leaks. Lot 1: Ideally two storage facilities are required, one to service the Yorkshire licence area and one to service to Northeast licence area. Ideally two storage facilities are required, one to service the Yorkshire licence area and one to service to Northeast licence area. The facilities must be easily accessible and centrally located and ideally situated close to the A1, A19, M1 or M62 motorway corridors.

Timeline

  1. Completed: Award date17 August 2021
  2. Completed: Award published16 September 2021
    Current notice

About the buyer

Northern Powergrid Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 63120000 · Storage and warehousing services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

1 similar open tenders

See more open tenders related to Electric Plant Storage.

Explore all open tenders

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.