Prequalification of Contractors (and PSCS) for Scheme 2 Athlone Marina to Athlone Castle Cycleway Link
Details
- Supplier(s)
- Jons Civil Engineering Co. Ltd
- Topic
- Construction work for bridges and tunnels, shafts and subways
- Published
- 8 September 2021
- Source
- ie:e_tenders
Tender description
The National Roads Office of Westmeath County Council are inviting submissions from contractors to prequalify through a Suitability Assessment Questionnaire in the First Stage of the restricted tender procedure for the Construction of the Scheme 2 Whitegates to Athlone Castle Cycleway Link. This pre-qualification is for the Construction of the Athlone Cycle and Pedestrian Bridge over the River Shannon which is a key component of the Galway to Dublin Cycle route which ensures a segregated cycleway crossing that provides easy passage and, critically, safe access through the town of Athlone which is seen as a halfway point along the proposed Galway to Dublin Cycleway. The proposed scheme incorporates a new cycle bridge across the River Shannon with approach access ramps along the river adjacent to the Radisson Hotel to the east and at the Luan Gallery to the west. The proposed bridge structure comprises a two-span bridge with a pier in the middle of the river and end supports on the riverbanks. Both spans are of approximately 52m in length. The overall length of the main bridge is approximately 104m. The proposed East ramp structure comprises an approach ramp to the bridge, landing, staircase, and a cantilevered walkway along the river. The length of the approach ramp is approximately 80.5m and the length of the walkway is approximately 101m. The landing and staircase are approximately 10m each in length. The proposed West ramp structure similarly comprises a main ramp, landing area, stairs, and a cantilevered walkway along the west side of the river. The length of the ramp is approximately 95m and the length of the walkway is 113m approx. In order to qualify for consideration each tenderer must submit the form QW1 SAQ, QW 3 SAQ and along with supplement QW1 3.4.1, QW1 3.4.2 and QW3 3.4.1 with all supporting documents and appendices attached to this tender.
Timeline
- Completed: Award published8 September 2021Current notice
- Completed: Award date8 September 2021
About the buyer
Westmeath County Council is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45221000 · Construction work for bridges and tunnels, shafts and subways
- 45221119 · Bridge renewal construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@westmeath-county-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@westmeath-county-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@westmeath-county-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@westmeath-county-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@westmeath-county-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@westmeath-county-council.gov |
Related topics
Topics related to Prequalification of Contractors (and PSCS) for Scheme 2 Athlone Marina to Athlone Castle Cycleway Link, ranked by notice volume.
- 11,175£1.0tn
- 26,970£1.7tn
- 4,088£269.5bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
