Tender description

Gate 4 covers all 12 services as outlined in this qualification system briefing document. There is a separate DS3 system services agreement for services in Ireland, which is to be entered into with EirGrid and a separate DS3 system services agreement for services in Northern Ireland, which is to be entered into with SONI. The services are split into a number of lots for each of the TSOs as follows: Lots 1IE – 12IE relate to the system services required by EirGrid, Lots 1NI – 12NI relate to the system services required by SONI. It is intended that the start date of each of the contracts awarded under Gate 4 is 1 April 2021. It is intended that the term of each contract will last until 30 April 2023, but with an option for each TSO to extend the term of its contract in respect of any or all of its applicable lots in certain defined cases for 2 additional time periods of up to eighteen (18) months each, at the discretion of the contracting entity. Lot 200974: POR L1IE - Primary Operating Reserve Primary Operating reserve or ‘POR’ has the meaning given to it in the Grid Code. Lot 200975: SOR L2IE - Secondary Operating Reserve Secondary Operating reserve or ‘SOR’ has the meaning given to it in the grid code. Lot 200976: TOR1 L3IE - Tertiary 1 Operating Reserve Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code. Lot 200977: TOR2 L4IE - Tertiary 2 Operating Reserve Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code. Lot 200978: RRD L5IE - Replacement Reserve (De-Synchronised) RR (De-synchronised)’ means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit. Lot 200979: RRS L6IE - Replacement Reserve (Synchronised) RR (Synchronised)’ means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module. Lot 200980: SSRP L7IE - Steady State Reactive Power Steady-state reactive power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging). Lot 200981: SIR L8IE - Synchronous Inertial Response Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF). Lot 200982: RM1 L9IE - Ramping Margin 1 Hour Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period. Lot 200983: RM3 L10IE - Ramping Margin 3 Hour Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period. Lot 200984: RM8 L11IE - Ramping Margin 8 Hour Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period. Lot 200985: FFR L12IE - Fast Frequency Response Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event. Lot 200986: POR L1NI - Primary Operating Reserve Primary Operating Reserve or ‘POR’ has the meaning given to it in the grid code. Lot 200987: SOR L2NI - Secondary Operating Reserve Secondary Operating Reserve or ‘SOR’ has the meaning given to it in the grid code. Lot 200988: TOR1 L3NI - Tertiary 1 Operating Reserve Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code. Lot 200989: TOR2 L4NI - Tertiary 2 Operating Reserve Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code. Lot 200994: RRD L5NI - Replacement Reserve (De-Synchronised) RR (De-synchronised) means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (iii) when connected to the power system in the case of a demand side unit. Lot 200999: RRS L6NI - Replacement Reserve (Synchronised) RR (Synchronised)’ means replacement reserve provided by the providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module. Lot 201000: SSRP L7NI - Steady State Reactive Power Steady-state Reactive Power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging). Lot 201001: SIR L8NI - Synchronous Inertial Response Synchronous Inertial Response (SIR) is the Kinetic Energy (at a Frequency of 50Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR Factor (SIRF). Lot 201002: RM1 L9NI - Ramping Margin 1 Hour Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 2 hours after the 1 hour period has elapsed. It is limited by the lowest availability in that 3 hour period. Lot 201004: RM3 L10NI - Ramping Margin 3 Hour Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within 3 hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period. Lot 201005: RM8 L11NI - Ramping Margin 8 Hour Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period. Lot 201006: FFR L12NI - Fast Frequency Response Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event.

Timeline

  1. Completed: Award published27 April 2021
    Current notice
  2. Completed: Award date27 April 2021

About the buyer

EirGrid plc is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 71314000 · Energy and related services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

17 similar open tenders

See more open tenders related to DS3 System Services – Volume Uncapped – Gate 4.

Explore all open tenders

Related topics

Topics related to DS3 System Services – Volume Uncapped – Gate 4, ranked by notice volume.

View all topics
TopicCountValue
  1. 4,088
    £269.5bn

Related buyers

Buyers similar to EirGrid plc.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.