Archaeology Framework
Details
- Supplier(s)
- Value
- GBP 292,200,000
- Topic
- Site-investigation services
- Published
- 20 April 2021
- Source
- uk:find_a_tender
Tender description
Highways England (HE) has a legal obligation to ensure that archaeological remains are preserved, and recorded where new roads, motorway widening projects and trunk road improvements are built by providing appropriate archaeological expertise, advice on design and contract documentation, supervising, monitoring, search and recovery and reporting progress on all stages of work. HE has highlighted the need for an archaeology framework with technically competent, capacity enabled suppliers, to provide a consistent route across programmes/directorates, drive savings and build direct relationships with suppliers. The framework will be enabled for use by Highways England other Contractors. The framework will be composed of six lots. Work orders will be undertaken through lots 1a, 2a and 3a with values based on individual Schemes within each lot: Lot 1a: up to GBP 2 million, Lot 2a: GBP 2 million — <GBP 5 million, Lot 3a: GBP 5 million or more. Time charge orders will be undertaken through lots 1b 2b and 3b. Lot 1a: The scope of the services and works that will be delivered under the framework will cover six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including: • avoidance, preservation by burial or investigation in the case of archaeological remains; • relocation, photographic or drawn to scale surveys in the case of historic buildings; • recording, information panels or landscape works in the case of impacts on historic landscapes; and • reduction to impact on setting through screening or landscaping. Stage 5: Archaeological mitigation for on-site works • preservation of archaeological sites in situ (some may require small scale investigation); and • archaeological recording of assets to be removed by the package contract. Stage 6: Archaeological mitigation programme for off-site works • preliminary processing of excavated material and data; • post-fieldwork assessment; • analysis and publication; and • public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological. Supplier may be required to undertake or monitor other suppliers’ activities. Additional information: Lot 1a is for schemes of value < 2 million. As the roads investment strategy 2 period progresses Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes. When considering potential value of work which may be won by a successful supplier, tenderers should consider the total expected value of the framework as well as the relevant lot. Lot 1b: The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including: • avoidance, preservation by burial or investigation in the case of archaeological remains; • relocation, photographic or drawn to scale surveys in the case of historic buildings; • recording, information panels or landscape works in the case of impacts on historic landscapes; and • reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works: • preservation of archaeological sites in situ (some may require small scale investigation); and • archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works • preliminary processing of excavated material and data; • post-fieldwork assessment; • analysis and publication; and • public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities. Lot 2a: The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including: • avoidance, preservation by burial or investigation in the case of archaeological remains; • relocation, photographic or drawn to scale surveys in the case of historic buildings; • recording, information panels or landscape works in the case of impacts on historic landscapes; and • reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works: • preservation of archaeological sites in situ (some may require small scale investigation); and • archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works • preliminary processing of excavated material and data; • post-fieldwork assessment; • analysis and publication; and • public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities Additional information: Lot 2a is for schemes of value GBP 2 million — < GBP 5 million. As the roads investment strategy 2 period progresses Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes. When considering potential value of work which may be won by a supplier, tenderers to consider the total expected value of the framework as well as the relevant lot Lot 2b: The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including: • avoidance, preservation by burial or investigation in the case of archaeological remains; • relocation, photographic or drawn to scale surveys in the case of historic buildings; • recording, information panels or landscape works in the case of impacts on historic landscapes; and • reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works: • preservation of archaeological sites in situ (some may require small scale investigation); and • archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works • preliminary processing of excavated material and data; • post-fieldwork assessment; • analysis and publication; and • public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities Lot 3a: The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including: • avoidance, preservation by burial or investigation in the case of archaeological remains; • relocation, photographic or drawn to scale surveys in the case of historic buildings; • recording, information panels or landscape works in the case of impacts on historic landscapes; and • reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works: • preservation of archaeological sites in situ (some may require small scale investigation); and • archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works • preliminary processing of excavated material and data; • post-fieldwork assessment; • analysis and publication; and • public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities. Additional information: Lot 3a is for schemes of value > GBP 5 million. As the roads investment strategy 2 period progresses Highways England reserves the right to transfer any unallocated value between lots to fund additional schemes. When considering potential value of work which may be won by a successful supplier, tenderers should consider the total expected value of the framework as well as the relevant lot. Lot 3b: The scope of all lots covers six stages: Stage 1: The provision of general early-stage, desk-based advice on the production and costing of deliverables and interventions to inform a submission. Stage 2: Includes the provision of detailed assessment from the framework suppliers. This would cover the range of skill sets not normally found ‘in-house’ within the Client’s design-consultancy providers. Stage 3: Detailed design and implementation of investigations. The framework suppliers supply non-intrusive and intrusive archaeological investigations as appropriate. Stage 4: Mitigation measures including: • avoidance, preservation by burial or investigation in the case of archaeological remains; • relocation, photographic or drawn to scale surveys in the case of historic buildings; • recording, information panels or landscape works in the case of impacts on historic landscapes; and • reduction to impact on setting through screening or landscaping. Stage 5: archaeological mitigation for on-site works: • preservation of archaeological sites in situ (some may require small scale investigation); and • archaeological recording of assets to be removed by the package contract. Stage 6: archaeological mitigation programme for off-site works • preliminary processing of excavated material and data; • post-fieldwork assessment; • analysis and publication; and • public archaeology and community engagement. Where archaeological remains are to be preserved in situ the archaeological supplier may be required to undertake or monitor other suppliers’ activities
Timeline
- Completed: Award date14 September 2020
- Completed: Award published20 April 2021Current notice
About the buyer
National Highways Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71510000 · Site-investigation services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@national-highways-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@national-highways-limited.gov |
3 similar open tenders
See more open tenders related to Archaeology Framework.
Related buyers
Buyers similar to National Highways Limited.
- 2,703£1.7bn
- 696£8.8bn
- 480£15.4bn
- 436£3.8bn
- 353£20.6m
- 306£371.3m
- 263£233.9m
- 254£580.8m
- 241£10.1bn
- 171£48.3m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
