Multi-Supplier Framework for the provision of Ground Investigation Works on the N24 Cahir to Limerick Junction and N24 Waterford to Cahir Projects.
Details
- Published
- 24 March 2021
- Submission
- 16 April 2021
- Source
- Ireland
Tender description
Tipperary County Council (“the Procuring Authority”) acting as a purchasing body is procuring on its own behalf and on behalf of Kilkenny County Council (“the Contracting Authorities”) a multi-supplier Framework for the provision of Ground Investigation Works on the ‘N24 Cahir to Limerick Junction and N24 Waterford to Cahir Projects’. There will be two identical Framework Agreements, one for each Contracting Authority that will allow for up to five framework contractors (provided sufficient tenderers qualify) to qualify for a place on the Framework. The same five contractors will quality for a place on both Frameworks. It is envisaged that Tipperary County Council and Kilkenny County Council will each procure a number of ground investigation contracts running concurrently in the study areas for each of the two projects at Phase 2 Option Selection (2021/2022) and at Phase 3 Design and Environmental Evaluation (2022/2024) by way of mini-competitions (call-offs) from this Framework. The ground investigation contracts may comprise of Cable Percussive Boreholes, Rotary Percussive Boreholes, Geobor S Rotary Drilling, Window Samples, Trial Pits, Slit Trenches, Observation Pits & Trenches, Dynamic Probes (DPH) & (DPSH), Cone Penetration Testing (including static cone & seismic cone), Land Geophysical Surveying (including ground penetrating radar, electro magnetic conductivity, electrical resistivity tomography, seismic refraction spreads, 2D MASW, microgravity profiles & 2D resistivity), Down the Hole Geophysical Surveying (including calliper, natural gamma, resistivity, sonic, fluid temperature, conductivity & fluid flow), Overwater Geophysical Surveying (including underwater MASW, underwater seismic refraction & sub-bottom profiling), Groundwater Monitoring Installations, Combined Groundwater & Gas Monitoring Installations, Push in Vibrating Wire Groundwater Piezometers, Reporting and Acting as PSCS for the duration of the Contracts. Refer to the Specification.
Timeline
- Completed: Tender published24 March 2021Current notice
- Completed: Submission date16 April 2021
About the buyer
Tipperary County Council is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@tipperary-county-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@tipperary-county-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@tipperary-county-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@tipperary-county-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@tipperary-county-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@tipperary-county-council.gov |
Related topics
Topics related to Multi-Supplier Framework for the provision of Ground Investigation Works on the N24 Cahir to Limerick Junction and N24 Waterford to Cahir Projects., ranked by notice volume.
- 527£3.0bn
- 1,418£20.1bn
- 4,088£269.5bn
Related buyers
Buyers similar to Tipperary County Council.
- 70£462.2m
- 69£1.4bn
- 60£179.9m
- 55£6.0bn
- 50£28.7m
- 47£25.8m
- 44£15.7m
- 43—
- 33£3.0m
- 27—
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
