Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead
Details
- Supplier(s)
- Name not disclosed
- Value
- GBP 1
- Topic
- Metalworking
- Published
- 8 January 2021
- Source
- ContractsFinder
Tender description
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to the Lee Tunnel, which will transfer the combined sewage to Beckton Sewage Treatment Works for treatment. The Project extends from Acton Storm Tanks in west London, to Abbey Mills Pumping Station in east London. The Project includes associated works at Beckton STW, Shad Thames Pumping Station and Bekesbourne Street. The geographic layout of the Project and local authorities through which it passes is shown in Figure 1. The Project comprises: a. tunnels: i. a main tunnel which will capture and store combined sewage from CSOs along its route and transfer it to Abbey Mills Pumping Station, from where the Lee Tunnel will transfer it for treatment at Beckton Sewage Treatment Works ii. 11 connection tunnels, which will link flows from CSOs to the main tunnel. b. Worksites: i. five main tunnel Worksites (drive and/or reception sites) ii. 16 CSO Worksites iii. two System modification Worksites Thames Tideway Tunnel iv. works at Beckton Sewage Treatment works. Section 4: Scope of Works Hammersmith site has requirement for a Connection Culvert Bulkhead detailed in the drawings provided with this advert. The Bulkhead shall be supplied with all the fixings required for BMB to assemble the bulkhead in the Hammersmith Connection Culvert. No construction or manufacture should commence until BMB have confirmed approval of drawings. Approved for construction drawings will be issued as soon as they become available. All deliveries are to be in accordance with the delivery requirements (FORS). Returned quotations will be evaluated by BMB JV's (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) Procurement team in conjunction with our design and engineering teams. Quotations will be evaluated based on; Cost Timeliness of return Adherence to and demonstration of understanding of the drawings and specifications provided at this point. Provision of accurate product specifications to accompany the quotation. Supplier experience of similar projects,evidence of this will be requested should the initial quotation be of interest. Should the candidate supplier be shortlisted they will then be contacted directly by a member of the BMB Procurement Team within two weeks of shortlisting to discuss the requirement in detail. BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) BMB-JV Tideway West, Hammersmith Pumping Station, Distillery Road, Hammersmith, W6 9AD
Timeline
- Completed: Contract expiry date9 December 2020
- Completed: Award date11 December 2020
- Completed: Award published8 January 2021Current notice
About the buyer
BMB Joint Venture (BAM Nuttall, Morgan Sindall PLC & Balfour Beatty) is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45262670 · Metalworking
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@bmb-joint-venture-bam-nuttall-morgan-sindall-plc-balfour-beatty.gov |
2 similar open tenders
See more open tenders related to Thames Tideway Tunnel - C405 Main Works West - Hammersmith Connection Culvert Bulkhead.
- Open tender
Housing Maintenance & Repair
- Open tender
Construction work
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
