Energy and related services
Details
- Buyer
- EirGrid plc
- Topic
- Energy and related services
- Published
- 11 November 2020
- Source
- TedNotices
Tender description
This tender process is now complete. Gate 3 covered all 12 services as outlined in this qualification system briefing document. There is a separate DS3 System Services Agreement for services in Ireland, which is to be entered into with EirGrid and a separate DS3 System Services Agreement for services in Northern Ireland, which is to be entered into with SONI. The services are split into a number of lots for each of the TSOs as follows: — Lots 1IE – 12IE relate to the System Services required by EirGrid, — Lots 1NI – 12NI relate to the System Services required by SONI. The start date of each of the contracts awarded under Gate 3 is 1 October 2020. It is intended that the term of each contract will last until 30 April 2023, but with an option for each TSO to extend the term of its contract in respect of any or all of its applicable lots in certain defined cases for 2 additional time periods of up to eighteen (18) months each, at the discretion of the contracting entity. Primary operating reserve or ‘POR’ has the meaning given to it in the Grid Code. Secondary Operating reserve or ‘SOR’ has the meaning given to it in the grid code. Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code. Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code. RR (De-synchronised)’ means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (ii) when connected to the power system in the case of a demand side unit. RR (Synchronised)’ means Replacement Reserve provided by the Providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module. Steady-state reactive power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging). Synchronous Inertial Response (SIR) is the kinetic energy (at a Frequency of 50 Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR factor (SIRF). Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to the company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest availability in that three hour period. Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within three hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period. Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period. Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event. Primary Operating Reserve or ‘POR’ has the meaning given to it in the grid code. Secondary Operating Reserve or ‘SOR’ has the meaning given to it in the grid code. Tertiary 1 operating reserve or ‘TOR1’ has the meaning given to it in the grid code. Tertiary 2 operating reserve or ‘TOR2’ has the meaning given to it in the grid code. RR (De-synchronised) means replacement reserve provided by the providing unit when: (i) not Synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level less or equal to 0 MW in the case of an energy storage providing unit, or (iii) when connected to the power system in the case of a demand side unit. RR (Synchronised)’ means replacement reserve provided by the providing Unit when: (i) synchronised to the power system in the case of a synchronous providing unit, or (ii) when connected to the power system and operating at a level greater than 0 MW in the case of an energy storage providing unit or power park module. Steady-state Reactive Power or ‘SSRP’ means reactive power capability (Leading) and reactive power capability (Lagging). Synchronous Inertial Response (SIR) is the Kinetic Energy (at a Frequency of 50Hz) of a centrally dispatched synchronous providing unit multiplied by the SIR Factor (SIRF). Ramping Margin 1 is the increased MW Output and/or MW Reduction that a providing unit can provide to The company within one hour of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 2 hours after the 1 hour period has elapsed. It is limited by the lowest availability in that 3 hour period. Ramping Margin 3 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within 3 hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 5 hours after the 3 hour period has elapsed. It is limited by the lowest availability in that 8 hour period. Ramping Margin 8 is the increased MW Output and/or MW reduction that a providing unit can provide to the company within eight hours of the company issuing a dispatch instruction to a service provider and that the providing unit can maintain for a further 8 hours after the 8 hour period has elapsed. It is limited by the lowest availability in that 16 hour period. Fast Frequency Response (FFR) is the additional MW Output or MW reduction required compared to the pre- incident MW output or MW reduction, which is fully available from a providing unit within 2 seconds after the start of an event and sustainable up to 10 seconds after the start of the event.
Timeline
- Completed: Award published11 November 2020Current notice
About the buyer
EirGrid plc is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71314000 · Energy and related services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@eirgrid-plc.gov |
17 similar open tenders
See more open tenders related to Energy and related services.
- Open tender
Property Works
- Open tender
PfH Energy Supply and Services DPS
- Open tender
South East Energy Agency DPS Qualification
- Open tender
Housing Maintenance & Repair
- Open tender
Demand Management and Renewables DPS
- Open tender
Demand Management and Renewables
Related topics
Topics related to Energy and related services, ranked by notice volume.
- 173,470£11.6tn
- 92,792£10.4tn
Related buyers
Buyers similar to EirGrid plc.
- 36£620.8m
- 19—
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
