Closed tender

Supply & Delivery of Storage Lockers - CME Mobility Project

Details

Published
6 November 2020
Submission
27 November 2020
Source
Ireland

Tender description

The Irish Rail Chief Mechanical Engineers (CME) Department are moving to electronic based processing for maintaining assets, moving away from paperwork to using an electronic App. To facilitate this change across the depots / workshops, mobile devices will be deployed. These devices will be held at the depots and when not in use, will need to be stored. Irish Rail CME Department use both iOS and Android devices, both in mobile and tablets forms. Lockers should be able to accommodate all types of devices. Storage Requirements: •One device per locker. •Locker to be large enough to store mobile phones, tablets and laptops. •Each locker is to have its own 3 pin electrical socket •Each locker to have charging ports (both iOS and Android) within it so that device can be charged when not in use. Compatible to latest charging standards such as USB-C port and USB 3.0 ports capable of high speed power delivery •Each locker to be securely locked and accessed by FOB,RFID (tag) or biometrics (such as fingerprint scan). •Supporting control / administration system, with user Interface to control and maintain user access and security. •Front of each locker to have a visible indicator to show, at a glance, if a device is stored or absent from that locker.

Timeline

  1. Completed: Tender published6 November 2020
    Current notice
  2. Completed: Submission date27 November 2020

About the buyer

Iarnród Eireann-Irish Rail is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Supply & Delivery of Storage Lockers - CME Mobility Project, ranked by notice volume.

View all topics
TopicCountValue
  1. 5,684
    £136.4bn
  2. 1,745
    £636.1bn

Related buyers

Buyers similar to Iarnród Eireann-Irish Rail.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.