Donemana Woodland Trail - Contractors PQQ T ENV 20-069
Details
- Topic
- Landscaping work
- Published
- 7 October 2020
- Submission
- 6 November 2020
- Source
- uk:ni-etenders
Tender description
The project is for the provision of a new woodland trail/walk within an existing mature woodland (Glebe Wood) in the village of Donemana, Strabane. BACKGROUND Derry City and Strabane District Council (DCSDC) and its various partners have recently completed similar facilities within the Council area and given their subsequent success, DCSDC would like to develop another woodland trail in the village of Donemana. An ICT with full design responsibilities has been appointed and has developed the design to Stage 4 – Technical Design (RIBA Plan of Work 2020 Stage 4). LOCATION and SITE DESCRIPTION Whilst the site is located to the East of the local Church and Primary School, the site access (farm/field gate) of the proposed facility is located between properties No 2 and No 8 Lupin Avenue, Donemana, Strabane, BT82 0PG (off Longland Road). DESCRIPTION OF THE PROJECT The contract is for the construction of a woodland trail/walk of an approximate length of 1.2km within a 7.6Ha mature/ancient woodland. The proposed works will take place within an environment of a highly sensitive nature due to the presence of a rich Fauna (bats, badgers, birds, etc.) and Flora, amongst which, a large variety of valuable ancient oaks and other varied tree species are present. All proposed works will require a substantial amount of planning with regards to the protections of those trees and main animal species found on site in order to avoid inflicting damages to those species. Those protections measures will be dictated and reviewed by the Lead Consultant’s Ecologist. It is envisaged that as a minimum, the proposed facility (not required to be DDA compliant but as accessible as possible) will generate the following works: Vegetation clearance (trees, shrubs and woodland sub-strata vegetation) and the construction of a new aggregate footpath, including geotextile, aggregate base, quarry dust wearing course, timber edging, drainage and other associated works such as provision of bespoke timber bridges, timber boardwalks, timber steps/ramps (with handrail), fencing (with gates), street furniture, signage, etc. Adjacent to the proposed footpath, the construction of an outdoor classroom (with seating) and planting of a community orchard (with associated natural play facility) will also be required. This list is not exhaustive and it will be the responsibility of the ICT to determine the totality of the works required to bring the proposed facility up to relevant BS/EU standards, Outdoor Recreation NI’s requirements and Client’s aspirations. CONTRACTOR DESIGN The Contractor will be required to undertake and accept full responsibility for the design of parts of the works. This includes, but is not limited to all temporary works and structures (such as bridges and boardwalks) required as part of the proposals. CONSTRUCTION PERIOD The contract period for the project is 12 weeks with a 12 month defects and Maintenance liability/correction period for most of the works/materials with an exception for proposed semi-matures trees (i.e. size 20/25 and above), for which a 24 month defects and Maintenance liability/correction period will apply.
Timeline
- Completed: Tender published7 October 2020Current notice
- Completed: Submission date6 November 2020
About the buyer
Derry City & Strabane District Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45112700 · Landscaping work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@derry-city-strabane-district-council.gov |
22 similar open tenders
See more open tenders related to Donemana Woodland Trail - Contractors PQQ T ENV 20-069.
- Open tender
General Building & Landscaping Works
- Open tender
Dynamic Purchasing System for Plant Hire
- Open tender
DPS
Related topics
Topics related to Donemana Woodland Trail - Contractors PQQ T ENV 20-069, ranked by notice volume.
- 11,175£1.0tn
- 26,970£1.7tn
Related buyers
Buyers similar to Derry City & Strabane District Council.
- 351£148.7m
- 135£19.5m
- 134£4.1bn
- 112£92.2m
- 77£98.5m
- 40£5.7m
- 39£3.5m
- 13£13.8m
- 3£1.2m
- 957£948.6m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
