Closed tender

Boiler installation work

Details

Value
GBP 918,000
Topic
Boiler installation work
Published
1 September 2020
Submission
30 September 2020

Tender description

Remove any existing heating system including storage heaters, multi-point water heaters, back boilers, gas wall heaters and any associated pipe work and make good. This excludes gas and electric warm air heaters that must not be removed due the risk of asbestos. (This clause does not apply for the installation only of new heating systems). This is a general comment and must be included in the surveyors report/survey. Install a Vaillant Eco Tec Sustain 28 ERP Condensing Combination Boiler or a Worcester Bosch Junior 30i ERP or an Ideal Logic 30 ERP (to include external filling loop) in a position agreed with the customer. The type of boiler is dependent on the percentage agreed in the contract by employers agent. Remove any existing heating system including storage heaters, multi-point water heaters, back boilers, gas wall heaters and any associated pipe work and make good. This excludes gas and electric warm air heaters that must not be removed due the risk of asbestos. (This clause does not apply for the installation only of new heating systems). This is a general comment and must be included in the surveyors report/survey. Install a Vaillant Eco Tec Sustain 28 ERP Condensing Combination Boiler or a Worcester Bosch Junior 30i ERP or an Ideal Logic 30 ERP (to include external filling loop) in a position agreed with the customer. The type of boiler is dependent on the percentage agreed in the contract by Employers Agent. The installation shall include: (a) security bracket and fixing bolt; (b) connections to heating circuit; (c) service/isolation valves; (d) waste pipes for disposal of condensate from the boiler to drain, (solvent weld plastic pipe) to be run internally where possible; (e) condensate pipe work run externally should be run in 32 mm plastic pipe work to a maximum length of 3 meters. This must have an in 1 in 5 fall with an air break at the top and terminate into the drain cover out site the property; (f) any additional external pipe work, foam insulation is to be used to cover or encase to protect from frost; (g) horizontal flue and terminal where ever possible unless specified or agreed by Employers Agent; (h) filling loop and Condense installed in accordance with Manufacturer’s instructions and British standards; (i) removal of existing cylinder and associated pipework; (j) modification to existing hot and cold water services pipework to connect new boiler; (k) modifications to airing cupboard comprising the supply and fitting of two slatted shelves, all making good and new plasterboard ceiling if required; (l) modifications to fire places to enable installation of electric fire or similar mentioned separately. If wooden fire surrounds are to be fitted, the builders opening is to be adequately sealed and vent installed; (m) Flue liners to be removed and make good upon removal; (n) fix heating circuit as per specification comprising of Radiators, TRV's and Lockshield valves, drain cocks and all appropriate pipe work and connections to the index circuit; (n) install new gas supply correctly sized to boiler, gas cooker and fire where required; (o) disconnect any old/existing iron or lead supplies and seal/cap off all open ends; (p) the correct volume of pipe from external gas meter box to inside property to be installed; (q) the index circuit must be installed to pipe manufactures specification (Uponor), to ensure adequate flow on the entire system; (r) combined lock shield valves are still to be fitted on the system; provision will be made for in line additional drain cock ½ BSP to be located at low level on the system. The Preferred location hallway /kitchen radiator; (s) machine pulled bends must be used when installing Uponor pipe work and be correctly sized. Fitting must be kept to a minimum if this process is not followed this will result in the contractors returning to site to rectify the installations at their own cost. (t) any night storage heaters that contain asbestos will to be identified at survey stage. All night storage heaters that do contain asbestos must be removed by a licensed contractor; (u) the use of an external automatic by-pass is not required or included; (v) electrical work to be in accordance with the specification; (w) the installation should be correctly flushed and an inline filter fitted. The installation must comply with BS 7593:2019 the new British Standard for preparation, commissioning and maintenance of domestic central heating; (x) Flush system with the correct flushing agents Sentinel x300 with Worcester and Vaillant boilers or Fernox F3 with Ideal boilers, shall be required on boiler changes; (y) fit system filter. Either Sentinel Vortex with Worcester or Vaillant boilers or Fernox TF1 with Ideal Boilers.

Timeline

  1. Completed: Tender published1 September 2020
    Current notice
  2. Completed: Submission date30 September 2020

About the buyer

Bristol City Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45331110 · Boiler installation work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.