Wetted Failed Fuel Radiolysis Reference number: NNLC178
Details
- Buyer
- Sellafield Limited
- Topic
- Instruments for measuring flow, level and pressure of liquids and gases
- Published
- 3 August 2020
- Submission
- 20 August 2020
- Source
- uk:contracts_finder
Tender description
NNL are currently contracted to carry out a series of trials to measure radiolytic gas generation. Because these measurements are to be made using irradiated material there are two significant constraints: • The quantity of material (predominantly a powder) used in each test must be minimised. • The samples and vessels must remain within a hot cell facility (see Appendix for details), therefore: o Sample lines between the text vessels and the measurement system located outside the hot cell will be long (~6-10 m). o Items in the hot cell will receive significant radiation doses and must be suitably radiation hardened. o All operations on equipment located in the hot cell (setup, operation, maintenance and dismantle) must be carried out remotely using master slave manipulators (see Appendix for examples). o Ambient temperature may vary in the range 5°C - 40°C during the year. NNL has developed a preliminary concept for undertaking the required measurements, show in Figure 1 : Figure 1 Initial Sampling Concept Some relevant characteristics of the proposed system are: • Individual tests will be conducted on a few grams of irradiated material in high integrity vessels with a total volume of ~ 3 cm3 and a free volume of ~ 2 cm3. • Connecting pipework to be narrow-bore, high pressure piping (nominally 1.6 mm, 1/16" bore) • The gas generated, in the test and whose composition needs to be measured, will depend on the test material and may be composed of either: o Hydrogen and sub-stochiometric quantity of oxygen (the degree of sub-stoichiometry is currently unknown); o Roughly equal amounts of hydrogen, carbon dioxide, carbon monoxide and methane, with trace amounts of higher hydrocarbons. • Small quantities of Kr and He may be released from the test materials as a result of radioactive decay, and their presence would need to be accounted for. • The reference sampling process would involve: o Evacuating the manifold and isolating it. o Opening the valve for designated test vessel valve to equalize pressure with manifold following which the valve would be closed to leave a gas sample of around 50µL in the manifold. o Sweep the sample using a carrier gas to it to the measurement instrument. • An equilibrium is expected to form which will limit the overall pressure generated. It can be assumed that the experiment will be terminated if the pressure exceeds a value which is expected to be less than 50 BarG. • Tests will be conducted for a number of source materials and test conditions, leading to between 20 and 30 simultaneous tests. Scoping calculations suggests that • gas will be generated at a rate of ~ 10-9 moles per day. • the pressure rise will be ~1.5 x 10-5 Bar.d-1 and • the concentration of each species will increase by o ~90 ppm per week of hydrogen, or o ~20 ppm per week each of hydrogen, methane etc. • The tests may last between 3 and 12 months
Timeline
- Completed: Pre-tender published3 August 2020Current notice
About the buyer
Sellafield Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 38420000 · Instruments for measuring flow, level and pressure of liquids and gases
- 38431100 · Gas-detection apparatus
- 38432000 · Analysis apparatus
- 38433000 · Spectrometers
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@sellafield-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@sellafield-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@sellafield-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@sellafield-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@sellafield-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@sellafield-limited.gov |
Related topics
Topics related to Wetted Failed Fuel Radiolysis Reference number: NNLC178, ranked by notice volume.
- 92,792£10.4tn
Related buyers
Buyers similar to Sellafield Limited.
- 1,730£206.0bn
- 464£2.1bn
- 376£250.5m
- 304£2.8bn
- 268£20.1bn
- 255£517.2m
- 203£1.0bn
- 147£900.8m
- 135£63.9m
- 104£1.0bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.