Awarded contract

Construction work for gas pipelines

Details

Topic
General construction work for pipelines
Published
31 July 2020

Tender description

Ballough Above Ground Installation (AGI) is a key piece of infrastructure on the Republic of Ireland transmission gas network. Numerous key pipelines converge on Ballough AGI. The AGI is located west of Lusk in North Co. Dublin adjacent to the M1 motorway. The scope of this construction contract is to create a bypass around Ballough AGI. As part of the contract the following new works will be required: • a new AGI, north of Ballough AGI adjacent to the existing 900 mm Gormanston to Ballough pipeline. The new AGI will contain above and below ground pipework, valves, pig trap facilities and associated civils and electrical/instrumentation works. • a new 700 m long, 750 mm bypass pipeline from the new AGI to the existing 750 mm pipeline to the West. As per the PQQ document. Ballough Above Ground Installation (AGI) is a key piece of infrastructure on the Republic of Ireland transmission gas network. Numerous key pipelines converge on Ballough AGI. The AGI is located west of Lusk in North Co. Dublin adjacent to the M1 motorway. The scope of this construction contract is to create a bypass around Ballough AGI. As part of the contract the following new works will be required: • a new AGI, north of Ballough AGI adjacent to the existing 900 mm Gormanston to Ballough pipeline. The new AGI will contain above and below ground pipework, valves, pig trap facilities and associated civils and electrical/instrumentation works. • a new 700 m long, 750 mm bypass pipeline from the new AGI to the existing 750 mm pipeline to the West. A trenchless crossing (approx. 150 m long) of the M1 motorway is required. The new pipeline will be a welded steel pipeline and will have a wall-thickness of 19.1mm. The design pressure of the new pipeline is 85 bar. • 2 No new 900 mm pipeline connections (approx. 100 m each) from the new AGI to the existing 900 mm Gormanston to Ballough pipeline. • 3 No stopple locations requiring 9 No split tees to be welded onto existing 750 mm and 900 mm diameter pipelines and under-pressure drilling of the pipeline at each split tee plus line stoppling/local bypass piping at the stopple locations. • modifications to the pipework arrangement at Ballough AGI including associated civil works. • testing and commissioning of all pipeline and AGI works. • discharge of the duties of PSCS / Contractor in accordance with applicable H&S legislation. • additional elements relating to the above scope of works.

Timeline

  1. Completed: Award date29 May 2020
  2. Completed: Award published31 July 2020
    Current notice

About the buyer

Ervia on behalf of Gas Networks Ireland is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45231100 · General construction work for pipelines
  • 45231110 · Pipelaying construction work
  • 45231220 · Construction work for gas pipelines
  • 45231221 · Gas supply mains construction work

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.