Closed tender

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Details

Value
GBP 1,957,000,000
Topic
Railway equipment
Published
30 April 2020
Submission
3 July 2020

Tender description

This procurement relates to track systems and HS2 Ltd intends to award the following contracts: 1) Delivery contract for Phase 1 Track — Urban including Birmingham Spur (Lot 1 below); 2) Delivery contract for Phase 1 Track — Open Route Central (Lot 2 below); 3) Delivery contract for Phase 1 Track — Open Route North (Lot 3 below); 4) Framework Agreement for Phase 2a Track delivery and other works (see Lot 4 below). Further information about the scope of works and the lots is set out in the remainder of this contract notice (see also Additional Information VI.3) in relation to related supply contracts) and in the pre-qualification pack (PQP). Expressions of interest are welcomed as set out in this contract notice and the PQP. Note there are restrictions on the number of lots 1 to 3 inclusive that may be awarded to any one tenderer. Economic operators may only express an interest in lot 4 if they are also expressing an interest in one or more of lots 1, 2 and 3. Please see below and the PQP. The scope of works included within lot 1 includes the following: Design and construction of: — 63 km of resilient cast in-situ slab track, — 21 km of standard pre-cast slab track (a separate supply arrangement), — 38 km of standard cast in-situ slab track or optional pre-cast slab track, — 75 mainline switches and crossings (S&C) units and 18 rail expansion devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement). The above includes the construction of any Hydraulically Bonded Layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements and the installation of long welded rails (to be supplied free-issue to the Contractor); — 20 No buffer stops — a combination of permanent and temporary units to support a phased entry into service; — 4 km of track spacing infill to provide drainage continuity to drainage systems installed by others; — 36 km of cable containment (troughing), to support the routing of HV and LV cables; — provision of (and subsequent removal of) a temporary railhead at West Ruislip for used for construction purposes, — a permanent maintenance facility at West Ruislip. All of the above figures are approximate. The extent of the lot 1 works includes the installation of all track infrastructure within the urban geographical area, which includes stations, open route, bored tunnels and cut-and-cover tunnels. The lot 1 works include the development of the detailed design for all track infrastructure within the urban geographical area and full integration of this design with the works of others including Main Work Civils and Railway Systems packages. This lot also includes the undertaking of static integration testing of the track system, as well as providing onsite support and facilitation of the dynamic testing phase coordinated by the client. The lot 1 works also include principal contractor duties under the Construction (Design and Management) Regulations 2015 for the line of route up to and including the permanent boundary, plus any railheads or temporary construction compounds required to support the delivery of the works. This Principal contractor role requires the provision of support to the client to manage the integration and prioritisation of construction activities, as well as the function of administering the Construction Railway Rulebook and managing the movement of engineering trains for itself and others within the working area. Further detailed requirements and responsibilities will be set out in the invitation to tender (ITT). The scope of works included within lot 2 includes the following: Design and construction of: — 159 km of standard pre-cast slab track (a separate supply arrangement); — 22 mainline switches and crossings (S&C) units and 18 Rail expansion devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement). The above includes the construction of any hydraulically bonded layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements and the installation of long welded rails (to be supplied free-issue to the Contractor); — 4 No buffer stops — a combination of permanent and temporary units to support a phased entry into service; — 81 km of track spacing infill to provide drainage continuity to drainage systems installed by others; — 393 km of cable containment (troughing), to support the routing of HV and LV cables; — provision of (and subsequent removal of) a railhead at Calvert to be used for construction purposes, which is then subsequently converted into an infrastructure maintenance depot (IMD) for the ongoing maintenance of HS2 Ltd's rail-mounted plant fleet. All of the above figures are approximate. The extent of the lot 2 works includes the installation of all track infrastructure within the central geographical area, including through open route, viaducts and cut-and-cover tunnels. The scope of the lot 2 works includes the development of the detailed design for all track infrastructure within the central geographical area and full integration of this design with the works of other railway systems packages. This lot also includes the undertaking of static integration testing of the track system, as well as providing on-site support and facilitation of the dynamic testing phase coordinated by the client. The lot 2 works also include the undertaking of principal contractor duties under the Construction (Design and Management) Regulations 2015 for the line of route up to and including the permanent boundary, plus any railheads or temporary construction compounds required to support the delivery of the works. This principal contractor role requires the provision of support to the client to manage the integration and prioritisation of construction activities, as well as the function of administering the Construction Railway Rulebook and managing the movement of engineering trains for itself and others within the working area. Final detailed arrangements will be as set out in the invitation to tender (ITT). The scope of works included within lot 3 includes the following: Design and construction of: — 176 km of standard pre-cast slab track (a separate supply arrangement); — 12 km of high-speed ballasted track (design and construction), to link the high-speed infrastructure with the conventional rail national network in the vicinity of Handsacre (north of Birmingham); — 42 mainline switches and crossings (S&C) units and 18 rail expansion devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement). The above includes the construction of any hydraulically bonded layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements and the installation of long welded rails (to be supplied free-issue to the Contractor); — 93 km of track spacing infill to provide drainage continuity to drainage systems installed by others; — 324 km of cable containment (troughing), to support the routing of HV and LV cables; — provision of (and subsequent removal of) a temporary railhead at Berkswell to be used for construction purposes. All of the above figures are approximate. The extent of the lot 3 works includes the installation of all track infrastructure within the North geographical area, including through open route, viaducts and cut-and-cover tunnels. The scope of the lot 3 works includes the development of the detailed design for all track infrastructure within the North geographical area and full integration of this design with the works of other railway systems packages. This lot also includes the undertaking of static integration testing of the track system, as well as providing onsite support and facilitation of the dynamic testing phase coordinated by the client. The lot 3 works also includes the undertaking of principal contractor duties under the Construction (Design and Management) Regulations 2015 for the line of route up to and including the permanent boundary, plus any railheads or temporary construction compounds required to support the delivery of the works. This principal contractor role requires the provision of support to the client to manage the integration and prioritisation of construction activities, as well as the function of administering the Construction Railway Rulebook and managing the movement of engineering trains for itself and others within the working area. Final detailed arrangements will be as set out in the invitation to tender (ITT). HS2 Ltd intends to establish a multi-supplier framework agreement (FA) alongside the delivery contracts for lots 1, 2 and 3. The scope of work covered by the FA will be: — the Phase 2a track delivery contract (see below); — the works covered by lots 1, 2 and 3 (or the residual elements of those works) in the event of the termination or other failure of those contracts due to contractor default (see the PQP and procurement docs for further detail); — other parts of the scope of lots 1, 2 and 3 works in the event they are omitted from those contracts for any reasons; — other optional works scope relating to the HS2 Track Systems or wider HS2 Project (See ITT for details). HS2 Ltd intends to appoint the following suppliers to the FA: • the successful tenderers for lots 1, 2 and 3 and, in the event they are different entities, • the second highest scoring tenderer for lots 1, • the second highest scoring tenderer for lot 2, and • the second highest scoring tenderer for lot 3. Economic operators may only express an interest in lot 4 if they do so in addition to expressing an interest in at least one of lots 1, 2 and 3. Economic operators expressing an interest in lots 1, 2 and/or 3 are not obliged to express interest in or ultimately be appointed to the FA. Any call-off contracts under the FA will be awarded following a mini-competition procedure, the rules for which will be set out in the full FA which will form part of the ITT for each lot. Only those parties appointed to the FA will be eligible to participate in such mini-competitions. There is no guaranteed minimum or maximum value of work to be awarded under the FA and HS2 Ltd reserves the right not to launch any mini-competition or award any call-off contracts under the FA, including for the avoidance of doubt, any call-off contract for all or part of the Phase 2a delivery contract. Further information about the operation of the FA appears in the PQP and will be set out in full detail in the ITT. HS2 Ltd reserves the right to provide in the FA for its use by any delivery body or other of its contractors or successor body appointed in relation to Phase 2a of the HS2 Project to call off the Phase 2a delivery contract. HS2 Ltd therefore reserves the right for the Phase 2a delivery contract to be entered into by that delivery body or other contractor or successor body. The Phase 2a delivery contract: HS2 Ltd reserves the right to award one or more call-off contracts for the Phase 2a delivery works. The scope of works included within the Phase 2a delivery contract (which shall be a call-off contract under the FA) includes the following: design and construction of — 119 km of standard pre-cast slab track (a separate supply arrangement); — 5 km of standard cast in-situ slab track or optional pre-cast slab track; — 23 mainline switches and crossings (S&C) units and 23 rail expansion devices (REDs) on a combination of the aforementioned track forms (a separate supply arrangement). The above includes the construction of any hydraulically bonded layer (HBL) or intermediate concrete layers, sleeper blocks or pre-cast elements and the installation of long welded rails (to be supplied free-issue to the Contractor); — 2 No buffer stops — either permanent or temporary units to support a phased entry into service; — 72 km of track spacing infill to provide drainage continuity to systems installed by others; — 314 km of cable containment (troughing), to support the routing of HV and LV cables; — provision of (and subsequent removal of) a railhead at stone to be used for construction purposes, which is then subsequently converted into an Infrastructure maintenance base; — rail served (IMB-R) for the ongoing maintenance of the clients rail-mounted plant fleet. The extent of the Phase 2a delivery contract scope lot 4 works includes the design and installation of all track infrastructure within the Phase 2a geographical area, incl. through open route, viaducts, bored and cut-and-cover tunnels. Principal contractor duties CDM Regs 2015.

Timeline

  1. Completed: Tender published30 April 2020
    Current notice
  2. Completed: Submission date3 July 2020

About the buyer

High Speed Two (HS2) Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 34940000 · Railway equipment
  • 34941200 · Track rails
  • 34941600 · Crossovers
  • 34941800 · Railway points
  • 34944000 · Points heating system
  • 34946000 · Railway-track construction materials and supplies
  • 34946110 · Rails
  • 34947000 · Sleepers and parts of sleepers
  • 43500000 · Track-laying vehicles
  • 45230000 · Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
  • 45234100 · Railway construction works
  • 45234112 · Railway depot construction work
  • 45234116 · Track construction works
  • 71320000 · Engineering design services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

19 similar open tenders

See more open tenders related to Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork.

Explore all open tenders

Related topics

Topics related to Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork, ranked by notice volume.

View all topics
TopicCountValue
  1. 11,175
    £1.0tn
  2. 26,970
    £1.7tn
  3. 4,088
    £269.5bn
  4. 1,792
    £81.3bn

Related buyers

Buyers similar to High Speed Two (HS2) Ltd.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.