Closed tender

Construction work for gas pipelines

Details

Value
GBP 6,000,000
Topic
Gas network equipment
Published
27 April 2020
Submission
8 June 2020

Tender description

EP UK Investments Ltd (EPUKI) on behalf of EPKL is planning a new high-pressure natural gas pipeline from the existing Belfast Transmission Pipeline to Kilroot Power Station in Northern Ireland. The objective of the Proposed Development is to provide a gas supply to the existing diesel fuelled Open Cycle Gas Turbines (OCGT) peaking plant at the Kilroot Power Station to enable the units to switch from diesel to gas fuel, and additionally to support potential future development of new natural gas fired generation. Subject to planning it is proposed to have the power station operating on gas by the end of 2022. The supplier will be required to provide full turnkey Engineering Design, Procurement and Construction) (EPC) Contract for the delivery of an Above Ground Installation (AGI) at Marshallstown, approximated 2.7 km of high-pressure gas pipeline, a second AGI at Kilroot and adjoining PRS (Pressure Reducing Station) at Kilroot. The scope of services shall include the project management, design, procurement, manufacture, shop testing, inspection, delivery and unloading, construction, installation, welding, health and safety management, painting/coating, inspection, testing and commissioning of the new gas pipeline, the Marshallstown AGI, the Kilroot AGI and the Kilroot PRS. The project will need to meet the requirements of United Kingdom, Northern Ireland, European and international regulations, orders, directives, BREF and standards, and comply with local permits, licences and codes. The Marshallstown AGI and high-pressure pipeline, greater than 12 ” diameter and > 50 bar pressure, will be constructed on a green field site and the Kilroot AGI and PRS will be constructed on brown field site at Kilroot Power Station. The majority of the pipeline will be installed underground using an ‘open cut’ method, where a trench is excavated, and pipe laid within it. Once the pipeline is installed, the trench will be back-filled and the land reinstated as far as possible to its original condition. Crossings of roads, including the A2, and any other obstacles will be by underground tunnelling or drilling to avoid disruption of traffic or road closures.

Timeline

  1. Completed: Tender published27 April 2020
    Current notice
  2. Completed: Submission date8 June 2020

About the buyer

EP UK Investments Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 39340000 · Gas network equipment
  • 39341000 · Gas pressure equipment
  • 44161100 · Gas pipelines
  • 44161110 · Gas-distribution network
  • 45231200 · Construction work for oil and gas pipelines
  • 45231220 · Construction work for gas pipelines
  • 45231221 · Gas supply mains construction work
  • 45333100 · Gas regulation equipment installation work
  • 65200000 · Gas distribution and related services
  • 65210000 · Gas distribution

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related buyers

Buyers similar to EP UK Investments Limited.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.