Construction work for multi-dwelling buildings and individual houses
Details
- Supplier(s)
21 suppliers
- AMP Construction & Groundworks Ltd
- AtkinsRéalis UK Limited
- B C Services (Anglesey) Ltd
- Brenig Construction Limited
- Carroll Ltd t/a James Carroll Builders and Contractors
- CASTLE GREEN HOMES LIMITED
- Castlemead Group Limited
- DU Construction Ltd
- Gareth Morris Construction
- K and C Construction Ltd
- Modularwise Limited
- MPH Construction
- NWPS Construction Ltd
- R L Davies & Son Ltd
- Robert Sheppard Construction Ltd
- Sovini Construction Limited
- TIR Construction Ltd (Lot 1 West only)
- W F Clayton & Co Ltd
- WATES CONSTRUCTION LIMITED
- Williams Homes (Bala) Ltd
- WRW Construction Ltd
- Value
- GBP 1,000,000,000
- Duration
- 4 years
- Topic
- District heating
- Published
- 6 April 2020
- Source
- TedNotices
Tender description
LHC is a joint committee of local authorities acting as the central purchasing body for WPA to set up a framework for residential construction (and any associated community buildings) across North and Mid-Wales. WPA is currently consulting with over 20 contracting authorities across North Wales with a potential development pipeline of 5000 Houses, plus Accommodation units. So far, contracting authorities (who have asked to be named as potential commissioners) have stated indicative targets of 2 420 homes. • Angelsey 60 by 2023 • Cartrefi Cymunedol Gwynnedd 550 by 2020 • Cartrefi Conwy 250 by 2024 • Clwyd Alyn 400-500 by 2023 • Flintshire 300 by 2023 • Grŵp Cynefin 360 by 2022 • North East Wales Homes Limited 200 by 2022 • North Wales HA 200 by 2023 • Wrexham County Borough Council — TBC. These targets are indicative and not a formal commitment to use this framework. Other contracting authorities as per the Public Contracts Regulations 2015 and as described in www.lhc.gov.uk/24 may also use the framework. Residential construction in Gwynedd The lot structure consists of nine lots across eight North and Mid-Wales Areas: Ynys Môn (Anglesey), Gwynedd, Conwy, Sir Ddinbych (Denbighshire), Sir y Fflint (Flintshire), Wrecsam (Wrexham), Ceredigion, North and South Powys. Plus, an additional ‘All Areas lot — covering lots 1-9 (the Super-Lot)’. The works (including associated Services and/or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes, etc. WPA anticipates a wide range of projects being delivered under the framework, from single smaller sites to complex multi-site projects. This is reflected in a value-banded lot structure within each Area (and the ‘all Areas 1-9’ (Super-Lot)), for delivery of developments of varying sizes: up to 5 units, 6-15 units, 16-49 units, 50 units and above. The framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places, health and care centres, recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, bidders will not be substantively evaluated on this aspect of development, rather clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in Ynys Môn (Anglesey. The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot))'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot),for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in Conwy The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in Sir Ddinbych (Denbighshire) The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in Sir y Fflint (Flintshire) The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in Wrecsam (Wrexham) The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in Ceredigion The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in North Powys The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection. Residential Construction in South Powys The lot structure consists of 9 lots across 8 North and Mid-Wales Areas: Ynys Môn (Anglesey); Gwynedd; Conwy; Sir Ddinbych (Denbighshire); Sir y Fflint (Flintshire); Wrecsam (Wrexham); Ceredigion; North and South Powys. Plus, an additional 'All Areas lot - covering lots 1 - 9 (the Super-Lot)'. The Works (including associated Services and / or Supplies) to be delivered are new build housing projects, including housing, bungalows, flats, apartments, care homes etc. WPA anticipates a wide range of projects being delivered under the Framework, from single smaller sites to complex multi-site projects. This is reflected in a Value-Banded Lot structure within each Area (and the 'all Areas 1-9' (Super-Lot)), for delivery of developments of varying sizes: up to 5 units; 6 – 15 units; 16 – 49 units; 50 units and above. The Framework also provides for the delivery of associated community buildings to residential developments (such as hubs and sporting facilities e.g. meeting places; health and care centres; recreational facilities and libraries). Plus, any associated commercial facilities such as car parks and retail units. However, whilst scope for this associated development is included, Bidders will not be substantively evaluated on this aspect of development, rather Clients seeking to commission such developments (permissible only as incidental to a residential scheme) will carry out a mini-competition. Capability to compete such developments is also not criteria for selection.
Timeline
- Completed: Award date27 March 2020
- Completed: Award published6 April 2020Current notice
- Completed: Contract expiry date6 March 2024
About the buyer
LHC is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 09323000 · District heating
- 45211000 · Construction work for multi-dwelling buildings and individual houses
- 45212000 · Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
- 71321100 · Construction economics services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@lhc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@lhc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@lhc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@lhc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@lhc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@lhc.gov |
33 similar open tenders
See more open tenders related to Construction work for multi-dwelling buildings and individual houses.
- Open tender
Property Works
- Open tender
CHIC Development Dynamic Purchasing System
- Open tender
Site Services (New Build)
Related buyers
Buyers similar to LHC.
- 121£121.6bn
- 79£1.9bn
- 42£6.0bn
- 27£1.8bn
- 20£10.8m
- 19£6.1bn
- 13£1.8bn
- 139£402.6m
- 49£6.8bn
- 5£2.6m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
