SmartPly invites expressions of interest from suitably qualified candidates for Engineering Design, Supply, installation and commissioning of Fire Protection Systems for this project.
Details
- Buyer
- SmartPly Europe DAC
- Published
- 9 December 2019
- Submission
- 20 December 2019
- Source
- Ireland
Tender description
The general scope required is all inclusive for the detailed design, supply, installation, testing and commissioning of fire protection systems for SmartPly Renewal Project. The candidates must confirm they have the resources and capability to Design to FM, NFPA and VDE Standards. Phase 1 – March 2020 1) Existing processing plant & equipment will still be operational & fire protected. The sections of the existing system that need to be modified/removed will have to be planned & managed accordingly. 2) Tie into existing sprinkler system. 3) Design, supply, installation & testing of new 250mm Underground fire main extension Phase 2 – Commencing October 2020 4) Valve room A – Control Valve Manifold to incorporate: a. Dry screen equipment & conveyors. b. Substituted load (W1). c. Dryer drum (W2). d. Material separation cyclone (W3). e. Clean gas duct (W4) f. Return air duct (W5). 5) Valve room A – Sprinkler system from valve room A 6) Fire Dump 1 – Automatic Deluge Type Sprinkler System. 7) Fire Dump 2 - Automatic Deluge Type Sprinkler System. 8) Wet Bin – Automatic Dry type Sprinkler System. 9) Supply feed to Dry Screen equipment from valve room A – (Conveyors, disc screen, dosing Bin and Oscillating Screen). 10) Supply feed to Substitute Load from valve room A– including Trace Heating and lagging. 11) Supply feed to Dryer Drum including Trace Heating and lagging from valve room A. 12) Supply feed to material separation cyclone including Trace Heating and lagging from valve room A. 13) Supply feed to clean gas duct including Trace Heating and lagging from valve room A. 14) Supply feed to Return air duct including Trace Heating and lagging from valve room A. 15) Valve room B/Sprinkler Room – Control Valve Manifold for: a. Thermal Oil. b. Transformers #1 & #2. c. Sprinkler room. d. Energy plant. e. Granulate silo. f. Fuel Storage. 16) Sprinkler room - Sprinkler System from valve room B 17) Thermal Oil room - Foam suppression system. 18) Transforme
Timeline
- Completed: Tender published9 December 2019Current notice
- Completed: Submission date20 December 2019
About the buyer
SmartPly Europe DAC is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@smartply-europe-dac.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@smartply-europe-dac.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@smartply-europe-dac.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@smartply-europe-dac.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@smartply-europe-dac.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@smartply-europe-dac.gov |
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.