Closed tender

19/208 - Ringsend WwTP – Digestion Capacity Increase

Details

Published
15 November 2019
Submission
4 December 2019
Source
Ireland

Tender description

Irish Water is currently upgrading the Ringsend WwTP, which treats most wastewater arising in the Greater Dublin Area (GDA), based on the application of aerobic granular sludge technology (Nereda®). The capacity of the upgraded WwTP will be approximately 2.4 Million Population Equivalent (PE), with 1 PE assumed to be 60 g BOD/day. Consequently, the existing sludge line needs to be upgraded to accommodate the increased load. The upgrade of the existing sludge line will involve upgrades to the existing thermal hydrolysis plant, modifications to the existing digesters and other ancillary works in the sludge treatment buildings. This PIN relates to the modification of the digesters only. The other works will be delivered by a Main Contractor appointed by Irish Water. This project will provide only for the increase of mesophilic digestion capacity. It will specifically provide for increasing the digestion capacity by employing a known and proven process within the existing 4 digesters - each with a capacity of 4,360m3. The digesters treat a mixture of primary and secondary sludges, normally pre-treated using CAMBI® thermal hydrolysis. The existing tanks must be modified alternately without interrupting the current digestion process. The process proposed must be proven and capable of digesting the aforementioned sludge streams at a capacity of c. 200 tds/d (peaking at 225 tds/d) at c.11% tds. The pre-treatment system must not be modified. Proposed processes that comprise the dosing of reagents and/or enzymes are not considered acceptable Any proposed process and controlling system will have been proven at full scale with similar feedstock over one year of successful operation at a scale of 10 tds/d. Further systems commissioned above this scale will enhance this proposal. The process shall provide stable digester operation at a Sludge Retention Time (SRT) of 6-8 days at average and peak conditions. (As per PIN Documents)

Timeline

  1. Completed: Tender published15 November 2019
    Current notice
  2. Completed: Submission date4 December 2019

About the buyer

Irish Water is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related buyers

Buyers similar to Irish Water.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.