Steam-generation plant construction work
Details
- Value
- EUR 350,000
- Topic
- Steam-generation plant construction work
- Published
- 14 October 2019
- Submission
- 15 November 2019
- Source
- TedNotices
Tender description
EPK are inviting tenders from qualified economic operators for the supply and delivery of specialist industrial ductwork, including all manufacturing and the installation, at the Kilroot power station. EPK have employed the services of RJM (Principle Designers) to design the SUFA (Secondary Under Fired Air) system. The purpose of this SUFA system will be to inject air directly into the centre of the rotating fireball, via the furnace hopper and reduce the levels of unburnt carbon. A key element of this system is a section of new ductwork which will supply preheated air to the furnace. This ductwork will transport air from the existing SA system, down towards the hopper and in through the hopper to the SUFA ports. Approximately 35 m of new ductwork is required, along with all associated equipment – coated support steelwork, fasteners, fixings, cladding, lagging, screws, gasket material, expansion joints, dampers and instrumentation. EPK are inviting tenders from qualified economic operators for the supply and delivery of specialist industrial ductwork, including all manufacturing and the installation, at the Kilroot power station. EPK have employed the services of RJM (Principle Designers) to design the SUFA (Secondary Under Fired Air) system. The purpose of this SUFA system will be to inject air directly into the centre of the rotating fireball, via the furnace hopper and reduce the levels of unburnt carbon. A key element of this system is a section of new ductwork which will supply preheated air to the furnace. This ductwork will transport air from the existing SA system, down towards the hopper and in through the hopper to the SUFA ports. Approximately 35 m of new ductwork is required, along with all associated equipment – coated support steelwork, fasteners, fixings, cladding, lagging, screws, gasket material, expansion joints, dampers and instrumentation.
Timeline
- Completed: Tender published14 October 2019Current notice
- Completed: Submission date15 November 2019
About the buyer
EP UK Investments Limited is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 45251230 · Steam-generation plant construction work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@ep-uk-investments-limited.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@ep-uk-investments-limited.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@ep-uk-investments-limited.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@ep-uk-investments-limited.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@ep-uk-investments-limited.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@ep-uk-investments-limited.gov |
Related topics
Topics related to Steam-generation plant construction work, ranked by notice volume.
- 4,088£269.5bn
Related buyers
Buyers similar to EP UK Investments Limited.
- 2,698£1.7bn
- 1,716£205.5bn
- 1,538£58.4bn
- 1,090£989.2m
- 950£2.3bn
- 910£690.9m
- 906£19.4bn
- 874£1.7bn
- 805£14.1bn
- 759£154.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
