Closed tender

STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge

Details

Value
GBP 180,000
Topic
Radioactive materials
Published
4 October 2019
Submission
1 November 2019

Tender description

Manging the heat exhaust from a fusion reactor is one of the most pressing challenges facing those seeking to realise a commercial power plant design. A fusion reactor heat exhaust is handled via a divertor, which needs to handle large heat fluxes (>10 MWm-2) especially in the divertor target. For spherical tokamak designs such as STEP, the compact nature of the device potentially increases the heat fluxes on the plasma-facing components, such as the divertor target, and restricts the space for incorporating cooling when compared to conventional larger aspect-ratio tokamaks such as ITER or EU-DEMO. Parallels can be drawn between the heat management challenges faced in the fusion community and those faced outside the fusion community, particularly in sectors such as motorsport, aerospace, power electronics, and renewable energy where high performance heat exchangers are utilized. The STEP Work Package 5 (Resilient Nuclear Components) wishes to harness industrial expertise in heat exchanger design outside the fusion community and to identify whether this expertise can be applied to developing an innovative heat exchanger concept design for the STEP divertor target.

Timeline

  1. Completed: Tender published4 October 2019
    Current notice
  2. Completed: Submission date1 November 2019

About the buyer

UK Atomic Energy Authority is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 09343000 · Radioactive materials
  • 38970000 · Research, testing and scientific technical simulator
  • 42511100 · Heat-exchange units
  • 71241000 · Feasibility study, advisory service, analysis
  • 71333000 · Mechanical engineering services
  • 71335000 · Engineering studies
  • 71336000 · Engineering support services
  • 71337000 · Corrosion engineering services
  • 71356200 · Technical assistance services
  • 73120000 · Experimental development services
  • 73220000 · Development consultancy services
  • 73300000 · Design and execution of research and development

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

26 similar open tenders

See more open tenders related to STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge.

Explore all open tenders

Related topics

Topics related to STEP WP5 - Fusion Power Plant - Diverter Heat Exchanger Design Challenge, ranked by notice volume.

View all topics
TopicCountValue
  1. 5,158
    £335.6bn
  2. 11,175
    £1.0tn
  3. 26,970
    £1.7tn

Related buyers

Buyers similar to UK Atomic Energy Authority.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.