Telecommunications services
Details
- Buyer
- Home Office
- Supplier(s)
- EE Limited
- Value
- GBP 681,400,000
- Topic
- Radio, television, communication, telecommunication and related equipment
- Published
- 28 August 2019
- Source
- TedNotices
Tender description
In December 2015, following an OJEU advertisement (2014/S 077-133654), the Home Office concluded ‘the ESN Lot 3 contract’ with EE Ltd (‘EE’), for the development and provision of a 4G network, as part of the emergency services network (‘ESN’) project. ESN will be used by organisations (including the emergency services) requiring a public safety communications solution (‘PSCS’). ESN will replace ‘Airwave’, which uses old technology and is costly. The new solution will provide ‘push to talk’ functionality and new data services. The Lot 3 services will provide the network for the push-to-talk and data solution provided by ESN’s Lot 2 provider. The Lot 3 network will utilise a network provider’s existing mobile network, but also bespoke services, including special ‘coverage’ (e.g. in tunnels and remote locations) and specific services (e.g. priority over other network traffic, high availability, security protections and integration with the Lot 2 solution and end-user devices. Under the existing ESN Lot 3 contract, the main services provided by EE (remaining the same following variation) comprise these key elements: — provision of mobile network coverage, capable of supporting the PSCS, — supply, installation and maintenance of radio equipment to enable coverage in an extended area, — provision of ESN and critical mobile communications services, — technical interfaces, — manage availability and capacity across the ESN mobile network, — support services, — a capability to deliver enhanced ESN coverage, and — testing of mobile devices ESN. Key aspects of the variation: — contract period to be extended. Its original term is due to expire on 8.12.2021 (or, insofar as extension options in the original contract are exercised, on 8.12.2022). The variation will extend the term to Dec 2024 in order to provide a network capable of supporting the new technology throughout the period for ‘rollout’ of the ESN solution to end users (from approximately Sept 2020 to Dec 2022), and for a relatively short period thereafter to enable stabilisation of the ESN solution, and preparation for transition to any new provider, — a new payment structure whereby EE will be paid for delivery of the network on the basis that it is materially completed; but any infrastructure which is not completed by the milestone date results in payment abatements, — a new methodology which sets out the process and approach to identification of any ‘gaps’ in the network and EE’s obligation to fix gaps, — the testing approach and timetable will be amended to be incremental rather than 'big bang' to align with the delivery of the ‘Kodiak’ push-to-talk application, — the transition of users onto the EE network will be phased over a 27-month period commencing in Sept 2020, — additional product and testing services to be provided by EE shall be paid for and ordered by the authority to support changes in the Lot 2 contract (e.g. Wave 7 000 to Kodiak), — joint commitment to build an engineering plan for evolving the ESN core network and IP Multimedia subsystem (‘IMS’) (a new standardised and virtualised core network). EE is to have a unilateral right of termination in the event that the ESN programme does not move to an IMS-hosted core, — historic disputes and claims between the Home Office and EE will be settled. The value of the Lot 3 ESN contract when originally procured was 735 800 000 GBP (‘m’). Pursuant to other developments or changes in the contract over its lifetime, its current value, prior to the amendments described herein, was 675 600 000 GBP at the time of the heads of terms. Following the amendments described herein, its total value over the lifetime of the contract will be to 895 700 000 GBP, and its prospective value from the date of amendment will be 681 400 000 GBP. The increase in value of 220 100 000 GBP from the 675 600 000 GBP figure to 895 700 000 GBP is made up of: — the extension to the contract term 216 000 000 GBP, — an extra 20 000 000 GBP in ROM costs associated with moving to an incremental delivery model, less — 15 900 000 GBP in reduced charges due to delayed roll out. The need for these changes is because the ESN project is delayed. It is necessary to extend the Lot 3 contract, which would otherwise expire during (or at best very shortly after) the ESN rollout period (from Sept 2020 to Dec 2022); otherwise, there would be a change of network provider during the critical rollout period, or a high risk of a change of provider during the critical rollout period; or, at best, a change of provider during the important period of stabilisation immediately following rollout. Other changes reflect changes to the Lot 2 contract (‘incremental’ rollout will mean at least some users being provided with an ESN solution earlier than they would with a ‘big bang’ rollout; mitigating the delays; and Lot 3 will now need to accommodate the new ‘Kodiak' solution from Lot 2) and refinement of the Home Office’s requirements.
Timeline
- Completed: Award date31 July 2019
- Completed: Award published28 August 2019Current notice
About the buyer
Home Office is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 32000000 · Radio, television, communication, telecommunication and related equipment
- 32523000 · Telecommunications facilities
- 45232332 · Ancillary works for telecommunications
- 45314000 · Installation of telecommunications equipment
- 48200000 · Networking, Internet and intranet software package
- 50312300 · Maintenance and repair of data network equipment
- 50312600 · Maintenance and repair of information technology equipment
- 50330000 · Maintenance services of telecommunications equipment
- 50334400 · Communications system maintenance services
- 51000000 · Installation services (except software)
- 64200000 · Telecommunications services
- 64212000 · Mobile-telephone services
- 64225000 · Air-to-ground telecommunications services
- 72000000 · IT services: consulting, software development, Internet and support
- 72253000 · Helpdesk and support services
- 72253200 · Systems support services
- 72315000 · Data network management and support services
- 72318000 · Data transmission services
- 72322000 · Data management services
- 98110000 · Services furnished by business, professional and specialist organisations
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@home-office.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@home-office.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@home-office.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@home-office.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@home-office.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@home-office.gov |
91 similar open tenders
See more open tenders related to Telecommunications services.
- Open tender
Fair Park Regeneration
- Open tender
DPS for Circuit Solutions
- Open tender
Expert Partner Panel Procurement 2026
- Open tender
Precise Policing 2
Related buyers
Buyers similar to Home Office.
- 1,538£58.4bn
- 751£1.3bn
- 692£133.2bn
- 641£160.0bn
- 338£7.4bn
- 327£1.3bn
- 281£1.1bn
- 265£902.8m
- 228£550.1m
- 186£223.2bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.