Construction work for gas pipelines
Details
- Buyer
- Ervia
- Topic
- Gas network equipment
- Published
- 20 August 2019
- Submission
- 23 September 2019
- Source
- TedNotices
Tender description
Contract for the construction of facility upgrades/modifications at GNI UK Beattock Compressor Station in Scotland. The scope will include the construction, installation, commissioning and certification of the new temporary bypass tie-ins, splitting of suction and discharge headers, suction throttling facility and AGI DCS control system integration. The works will require interfaces with existing site infrastructure and equipment such as the suction and discharge headers, existing pipework, compressor buildings, site electrical system, SCADA, ducting, drainage and existing civil layout. The works will require liaison throughout the project duration with various stakeholders, particularly the clients operations team and engineers. For further information please refer to PQQ document. Contract for the construction of facility upgrades/modifications at GNI UK Beattock Compressor Station in Scotland. The scope will include the construction, installation, commissioning and certification of the new temporary bypass tie-ins, splitting of suction and discharge headers, suction throttling facility and AGI DCS control system integration. The works will require interfaces with existing site infrastructure and equipment such as the suction and discharge headers, existing pipework, compressor buildings, site electrical system, SCADA, ducting, drainage and existing civil layout. The works will require liaison throughout the project duration with various stakeholders, particularly the clients operations team and engineers. The construction stage will include: 1) Pre-construction works including site-investigations and surveys, HAZCON, preparation of all HSQE documentation and programming and sequencing to ensure station operation is maintained; 2) Installation of a temporary supply to maintain station operations during works; 3) Installation of pipe arrangement to split suction and discharge headers; 4) Installation of suction throttling arrangement; 5) Liaise and assist C&I contractor for SCS integration; 6) Testing, snagging, commissioning and site acceptance tests. Handover to client with complete H&S File including all records, residual risk register, full life cycle O&M schedule and manuals. For further information please refer to PQQ document.
Timeline
- Completed: Tender published20 August 2019Current notice
- Completed: Submission date23 September 2019
About the buyer
Ervia is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 39340000 · Gas network equipment
- 39341000 · Gas pressure equipment
- 42112300 · Gas turbines
- 42123100 · Gas compressors
- 44161100 · Gas pipelines
- 45231220 · Construction work for gas pipelines
- 45255000 · Construction work for the oil and gas industry
- 45255300 · Gas terminal construction work
- 45255400 · Fabrication work
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@ervia.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@ervia.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@ervia.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@ervia.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@ervia.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@ervia.gov |
4 similar open tenders
See more open tenders related to Construction work for gas pipelines.
- Open tender
Construction work
Related buyers
Buyers similar to Ervia.
- 36£620.8m
- 19—
- 14£337.0m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.