Repair and maintenance services of ships
Details
- Buyer
- CalMac Ferries Ltd
- Supplier(s)
- Ardmaleish Boatbuilding Co Ltd, Dales Marine Services (Greenock) Ltd, Cammell Laird Shiprepairers and Shipbuilders Ltd
- Value
- GBP 8,000,000
- Duration
- 1 year
- Topic
- Repair and maintenance services of ships
- Published
- 18 July 2019
- Source
- TedNotices
Tender description
The service relates to the provision of annual dry dockings, slipping for routine repairs and classification and MCA survey of up to 33 Ro-Ro and passenger ferries ranging from approximately 20 m to 118 m for CalMac Ferries Ltd. The scope of work will comprise of main and intermediate dry dockings, with additional maintenance, repairs and replacements as required including modifications, upgrades, project work and emergency dockings. The buyer is using PCS-Tender to conduct this EPSD/ITT exercise. 9 small vessels Loch Linnhe Loch Riddon Ali-Cat Loch Buie Loch Alainn Loch Ranza Loch Bhrusda Isle of Cumbrae Argyll Flyer For the provision of annual overhauls, emergent works, repairs dry docking/slipping and emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with small vessels on average between 1 and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the Lot structure for further details of vessel movements 3 small vessels Hallaig Catriona Lochinvar For the provision of annual overhauls, emergent works, repairs, dry docking/slipping and emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with small vessels on average between 1 and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the Port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the lot structure for further details of vessel movements 4 vessels Loch Dunvegan Loch Shira Loch Portain Loch Fyne For the provision of annual overhauls, emergent works, repairs, dry docking/slipping, emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with small vessels on average between one and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the lot structure for further details of vessel movements 3 vessels Bute Argyle Coruisk For the provision of annual overhauls, emergent works, repairs, dry docking/slipping, emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with small vessels on average between one and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the lot structure for further details of vessel movements 4 vessels Lochnevis Lord of the Isles Hebridean Isles Caledonian Isles For the provision of annual overhauls, emergent works, repairs, dry docking/slipping,emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with Small vessels on average between 1 and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the Lot structure for further details of vessel movements. 3 vessels Isle of Mull Finlaggan Hebrides For the provision of annual overhauls, emergent works, repairs, dry docking/slipping and emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with small vessels on average between 1 and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the Port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the Lot structure for further details of vessel movements. 3 vessels Isle of Mull Finlaggan Hebrides For the provision of annual overhauls, emergent works, repairs, dry docking/slipping and emergency docking, project work, modifications and upgrades. This will be a multiple participant framework for 1 year. Vessels are subject to specific operational areas contained in the load line certificate for each vessel. Any contractor will require to be located within the geographical restrictions of the vessel. Vessel movements may also be subject to favourable weather conditions and MCA approval. The overhaul and repair works cycle time should be no greater than the dates specified in Appendix 3 – Vessel Restrictions and lots this is inclusive from the vessels place of operation to reinstatement and full return to service. Scope of work and specific vessel dependant, the vessels will on average require being in dock for 2 to 3 weeks with Small vessels on average between 1 and 2 weeks but may be longer depending on work scope. Tenderers should be aware that the time available to overhaul and complete all repairs, includes travel time from and to the port of operation. Tenderers must demonstrate how they will meet these deadlines. This includes arrival, MES deployment if required, entering dock, exiting and trials. Following framework formation, bids may be considered as bundles for a number of similar types of vessels. Please see the lot structure for further details of vessel movements.
Timeline
- Completed: Award date8 July 2019
- Completed: Award published18 July 2019Current notice
- Completed: Contract expiry date2 July 2020
About the buyer
CalMac Ferries Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 50241000 · Repair and maintenance services of ships
- 50241200 · Ferry repair services
- 50246100 · Dry-docking services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@calmac-ferries-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@calmac-ferries-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@calmac-ferries-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@calmac-ferries-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@calmac-ferries-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@calmac-ferries-ltd.gov |
Related topics
Topics related to Repair and maintenance services of ships, ranked by notice volume.
- 11,175£1.0tn
- 26,970£1.7tn
- 27,818£2.2tn
- 4,088£269.5bn
Related buyers
Buyers similar to CalMac Ferries Ltd.
- 4£469.6k
- 1£677.0k
- 389£10.0bn
- 105£1.4bn
- 104£762.9m
- 95£2.2bn
- 93£6.2m
- 78£866.9m
- 72£195.3m
- 48£82.5m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
