Repair and maintenance services for non-electrical machinery
Details
- Value
- GBP 21,000,000
- Topic
- Repair and maintenance services for non-electrical machinery
- Published
- 3 May 2019
- Submission
- 6 June 2019
- Source
- TedNotices
Tender description
The NWUPC is seeking to establish a multi-provider Framework Agreement on behalf of the members of NWUPC, CPC, APUC, HEPCW, LUPC, SUPC and NEUPC for gas equipment maintenance and repairs. Members referred to in the OJEU Notice may also participate in the Framework Agreement. This Framework Agreement will commence on 1.8.2019 for an initial period of 24 months until 31.7.2021 with the option to extend the Agreement for 12 months until 31.7.2022 and a further 12 months until 31.7.2023 subject to satisfactory economic operator performance. The Framework Agreement will be split into 26 lots covering 13 regions for domestic and non-domestic equipment up to 500 kw rated input and 13 regions for non-domestic equipment greater than 500 kw rated input. Lot 1 includes, but is not limited to, the following scope: domestic and non-domestic fired equipment maximum rated input of 500 kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, suppliers may be requested to provide maintenance and repairs for oil heating equipment if required. Lot 2 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 3 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 4 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 5 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 6 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 7 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 8 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 9 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 10 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 11 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 12 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 13 includes, but is not limited to, the following scope; Domestic and Non Domestic fired equipment maximum rated input of 500kW. This may include domestic fired heating equipment such as Gas fired boilers, gas fired water heaters, gas fired domestic gas cooking appliances installed within individual dwellings, within communal plant rooms serving residencies or academic buildings or domestic science laboratories. This may also include non-domestic gas fired boilers, gas fired indirect and direct fired forced convection air heaters, gas fired radiant heaters installed within individual dwellings, communal plant rooms serving residencies or academic building, non domestic buildings and sports facilities. This list is not exhaustive. This applies to works, as directed, carried out on gas fired equipment in the list above, associated controls and pipework. Although not mandatory, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 14 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 15 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 16 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 17 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 18 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 19 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 20 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 21 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 22 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 23 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 24 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 25 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required. Lot 26 includes, but is not limited to, the following scope; non-domestic gas fired heating equipment with maximum rated input exceeding 500kW. This will include gas fired boilers installed within communal plant rooms serving residencies or academic buildings. Although not a mandatory requirement, Suppliers may be requested to provide maintenance and repairs for Oil heating equipment if required.
Timeline
- Completed: Tender published3 May 2019Current notice
- Completed: Submission date6 June 2019
About the buyer
North Western Universities Purchasing Consortium is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 50531000 · Repair and maintenance services for non-electrical machinery
- 50531200 · Gas appliance maintenance services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@north-western-universities-purchasing-consortium.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@north-western-universities-purchasing-consortium.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@north-western-universities-purchasing-consortium.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@north-western-universities-purchasing-consortium.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@north-western-universities-purchasing-consortium.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@north-western-universities-purchasing-consortium.gov |
8 similar open tenders
See more open tenders related to Repair and maintenance services for non-electrical machinery.
- Open tender
Property Works and Consultancy DPS
- Open tender
Housing Maintenance & Repair
- Open tender
MoJ Minor Works Dynamic Purchasing System
- Open tender
Minor Works - Dynamic Purchasing System
- Open tender
Construction work
Related topics
Topics related to Repair and maintenance services for non-electrical machinery, ranked by notice volume.
- 27,818£2.2tn
Related buyers
Buyers similar to North Western Universities Purchasing Consortium.
- 641£160.0bn
- 56£33.4bn
- 48£11.9m
- 47£10.8m
- 22£1.1bn
- 18£33.5m
- 17£517.5m
- 11£96.6m
- 6£647.9k
- 5£2.1bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
