Torfaen County Borough Council with the support of Local Partnerships through the Green Growth Wales Programme has carried out an asset review of land in local authority ownership to identify opportunities for commercialisation and income generation through the development of renewables The capped former landfill site at Ty Coch was identified as a possible site and with good irradiance and a competitive grid connection offer to export electricity has become a priority opportunity. The opportunity is to develop up to 5MW of solar PV generation on land at Ty Coch in Torfaen to both generate a sustainable income and move towards a zero carbon economy. The land is owned by Torfaen County Borough Council (TCBC) and is currently a capped former landfill site with green field grazing land adjacent. Lot 1: Transformers Owner Requirement The manufacturer shall provide a number of transformers to the owner ready to generate energy at optimal conditions and operate as designed; If you are interested in bidding on the above please register your interest by contacting Adrian Jenkins on Telephone No. +441495 766791 or by e-mail to adrian.jenkins@torfaen.gov.uk. Please see attached document for more information. Lot 2: Inverters Owner Requirement The manufacturer shall provide a number of inverters to the owner ready to generate energy at optimal conditions and operate as designed; If you are interested in bidding on the above please register your interest by contacting Adrian Jenkins on Telephone No. +441495 766791 or by e-mail to adrian.jenkins@torfaen.gov.uk. Please see attached document for more information. Lot 3: Panels Owner Requirement The manufacturer shall provide a number of panels to the owner ready to generate energy at optimal conditions and operate as designed; If you are interested in bidding on the above please register your interest by contacting Adrian Jenkins on Telephone No. +441495 766791 or by e-mail to adrian.jenkins@torfaen.gov.uk. Please see attached document for more information.

Timeline

  1. Completed: Pre-tender published18 March 2019
    Current notice

About the buyer

Torfaen County Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 09300000 · Electricity, heating, solar and nuclear energy
  • 09330000 · Solar energy
  • 09331000 · Solar panels
  • 09331200 · Solar photovoltaic modules
  • 31155000 · Inverters
  • 31170000 · Transformers

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

29 similar open tenders

See more open tenders related to Future Delivery of a Solar Farm at Ty Coch Former Landfill Site.

Explore all open tenders

Related topics

Topics related to Future Delivery of a Solar Farm at Ty Coch Former Landfill Site, ranked by notice volume.

View all topics
TopicCountValue
  1. 4,088
    £269.5bn
  2. 3,593
    £717.5bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.