Closed tender

Construction work for airfields

Details

Value
GBP 4,500,000
Topic
Construction work for airfields
Published
1 March 2018
Submission
20 March 2018

Tender description

The airfield services project will enable the airfield infrastructure that is being constructed by CADP to be brought into operational use. The main elements of this scheme include fixed electrical ground power (FEGP), airfield ground lighting (AGL), stand services and the associated systems required for airfield operational management. The existing AGL systems will be updated to reflect the new airfield layout consisting of the following items: — Stop bar lights; — Intermediate holding position lights; — Taxiway centreline lights (bidirectional and direction switchable lights); — Taxiway blue edge lights; — Tug guidance lights; — Illuminated signs; — Runway guard lights; — Airfield ground lighting control and monitoring system. This project will also include the provision of the necessary aircraft stand services to enable the operation in the new airfield layout, consisting of the following items: — Painted markings; — Floodlighting; — Stand entry guidance systems; — Stand number ind. The airfield services project will enable the airfield infrastructure that is being constructed by CADP to be brought into operational use. The main elements of this scheme include fixed electrical ground power (FEGP), airfield ground lighting (AGL), stand services and the associated systems required for airfield operational management. The existing AGL systems will be updated to reflect the new airfield layout consisting of the following items: — Stop bar lights; — Intermediate holding position lights; — Taxiway centreline lights (bidirectional and direction switchable lights); — Taxiway blue edge lights; — Tug guidance lights; — Illuminated signs; — Runway guard lights; — Airfield ground lighting control and monitoring system. This project will also include the provision of the necessary aircraft stand services to enable the operation in the new airfield layout, consisting of the following items: — Painted markings; — Floodlighting; — Stand entry guidance systems; — Stand number indicators; — Fixed electrical ground power (FEGP); — Ground support equipment chargers; — Barrier edge lights. — Pump station system connection. — Fire mains and hydrants. These services will require interaction with the existing airfield services as well as installation of new services within the existing airfield and within the new deck that is being constructed. These systems will also be connected to new systems to be installed in the new east pier and east terminal extension.

Timeline

  1. Completed: Tender published1 March 2018
    Current notice
  2. Completed: Submission date20 March 2018

About the buyer

London City Airport Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 45235110 · Construction work for airfields

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Construction work for airfields, ranked by notice volume.

View all topics
TopicCountValue
  1. 5,158
    £335.6bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.