Design & Construction of a service tunnel & shaft for KW discharge drainage pipework replacement
Details
- Buyer
- Merseytravel
- Published
- 10 December 2018
- Submission
- 21 January 2019
- Source
- uk:procontracts
Tender description
Merseytravel is seeking to employ a suitably qualified Tunnel Engineering Design and Construction Company for the construction of a service tunnel and shaft for Kingsway Tunnels Discharge Drainage Pipework Replacement. The works are within the inverts of the two bores of the Kingsway Tunnel under the River Mersey. Merseytravel operates the two River Mersey underwater road crossing tunnels between Liverpool and Wallasey, Liverpool and Birkenhead in Merseyside. The Kingsway road tunnel is a twin tube tunnel, completed in 1971 and 1974, carries two traffic lanes under the River Mersey between Liverpool and Wallasey, Maximum speed is limited to 40 mph and annual throughput traffic is 13.5 million. Merseytravel would welcome interest from a suitably qualified Tunnel Engineering Design and Construction Company partner to assist with the design construction of the service tunnel. Keywords: drainage
Timeline
- Completed: Tender published10 December 2018Current notice
- Completed: Submission date21 January 2019
About the buyer
Merseytravel is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@merseytravel.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@merseytravel.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@merseytravel.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@merseytravel.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@merseytravel.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@merseytravel.gov |
Related topics
Topics related to Design & Construction of a service tunnel & shaft for KW discharge drainage pipework replacement, ranked by notice volume.
- 1,745£636.1bn
Related buyers
Buyers similar to Merseytravel.
- 389£10.0bn
- 104£762.9m
- 92£6.2m
- 78£866.9m
- 48£82.5m
- 44£9.2m
- 41£174.1m
- 40£25.1m
- 35£29.1m
- 27£143.1m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
