Energy and related services
Details
- Buyer
- EirGrid plc
- Topic
- Energy and related services
- Published
- 16 November 2018
- Source
- TedNotices
Tender description
A separate DS3 system services agreement has been awarded for both EirGrid (as contracting entity for the agreement applicable to Ireland) and SONI (as contracting entity for the agreement applicable to Northern Ireland). The services are split into a number of lots for each of the TSOs as follows: — Lots 1IE — 11IE relate to the System Services required by EirGrid, — Lots 1NI — 11NI relate to the System Services required by SONI. Primary Operating Reserve or ‘POR’ has the meaning given to it in the Grid Code. Secondary Operating Reserve or ‘SOR’ has the meaning given to it in the Grid Code. Tertiary 1 Operating Reserve or ‘TOR1’ has the meaning given to it in the Grid Code. Tertiary 2 Operating Reserve or ‘TOR2’ has the meaning given to it in the Grid Code. “RR (De-synchronised)” means Replacement Reserve provided by the Providing Unit when (i) not Synchronised to the Power System in the case of a Synchronous Providing Unit, or (ii) when connected to the Power System and operating at a level less or equal to 0 MW in the case of an Energy Storage Providing Unit or (ii) when connected to the Power System in the case of a Demand Side Unit; “RR (Synchronised)” means Replacement Reserve provided by the Providing Unit when (i) Synchronised to the Power System in the case of a Synchronous Providing Unit, (ii) or (ii) when connected to the Power System and operating at a level greater than 0 MW in the case of an Energy Storage Providing Unit or Power Park Module; Steady-State Reactive Power or ‘SSRP’ means Reactive Power Capability (Leading) and Reactive Power Capability (Lagging). Synchronous Inertial Response (SIR) is the Kinetic Energy (at a Frequency of 50Hz) of a Centrally Dispatched Synchronous Providing Unit multiplied by the SIR Factor (SIRF). Ramping Margin 1 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within one hour of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for A further two hours after the one hour period has elapsed. It is limited by the lowest Availability in that three hour period. Ramping Margin 3 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within three hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further five hours after the three hour period has elapsed. It is limited by the lowest Availability in that eight hour period. Ramping Margin 8 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within eight hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further eight hours after the eight hour period has elapsed. It is limited by the lowest Availability in that sixteen hour period. Primary Operating Reserve or ‘POR’ has the meaning given to it in the Grid Code. Secondary Operating Reserve or ‘SOR’ has the meaning given to it in the Grid Code. Tertiary 1 Operating Reserve or ‘TOR1’ has the meaning given to it in the Grid Code. Tertiary 2 Operating Reserve or ‘TOR2’ has the meaning given to it in the Grid Code. “RR (De-synchronised)” means Replacement Reserve provided by the Providing Unit when (i) not Synchronised to the Power System in the case of a Synchronous Providing Unit, Or (ii) when connected to the Power System and operating at a level less or equal to 0 MW in the case of an Energy Storage Providing Unit or (ii) when connected to the Power System in the case of a Demand Side Unit; “RR (Synchronised)” means Replacement Reserve provided by the Providing Unit when (i) Synchronised to the Power System in the case of a Synchronous Providing Unit, (ii) or (ii) when connected to the Power System and operating at a level greater than 0 MW in the case of an Energy Storage Providing Unit or Power Park Module; Steady-State Reactive Power or ‘SSRP’ means Reactive Power Capability (Leading) and Reactive Power Capability (Lagging). Synchronous Inertial Response (SIR) is the Kinetic Energy (at a Frequency of 50Hz) of a Centrally Dispatched Synchronous Providing Unit multiplied by the SIR Factor (SIRF). Ramping Margin 1 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within one hour of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest Availability in that three hour period. Ramping Margin 3 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within three hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further five hours after the three hour period has elapsed. It is limited by the lowest Availability in that eight hour period. Ramping Margin 8 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within eight hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further eight hours after the eight hour period has elapsed. It is limited by the lowest Availability in that sixteen hour period.
Timeline
- Completed: Award published16 November 2018Current notice
About the buyer
EirGrid plc is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71314000 · Energy and related services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@eirgrid-plc.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@eirgrid-plc.gov |
17 similar open tenders
See more open tenders related to Energy and related services.
- Open tender
Property Works
- Open tender
PfH Energy Supply and Services DPS
- Open tender
South East Energy Agency DPS Qualification
- Open tender
Housing Maintenance & Repair
- Open tender
Demand Management and Renewables DPS
- Open tender
Demand Management and Renewables
Related topics
Topics related to Energy and related services, ranked by notice volume.
- 173,470£11.6tn
Related buyers
Buyers similar to EirGrid plc.
- 36£620.8m
- 19—
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
