Construction management services
Details
- Topic
- Construction-related services
- Published
- 10 August 2018
- Submission
- 31 August 2018
- Source
- TedNotices
Tender description
Birmingham Airport is seeking to appoint a Construction Manager to identify the optimum phased packages of work necessary to deliver the construction of the Terminal Extension 3 (TE18) Project, to lead in the procurement of these work packages on behalf of the Airport and to manage the delivery of the work packages so as to ensure that the Project is delivered to time, cost and quality. The scope of the TE18 project is, in summary the construction of a new three storey extension to the existing terminal building, circa 10 000 m2. The works comprise: — Demolition of existing slabs and structures as required for the works — All groundworks and provision of new foundations as required by the design — Installation of new structural frame, cladding and roofing works. — Installation of Mechanical, electrical and public health systems. Integration of these systems with the Airport’s wider MEP systems where specified. — Internal fit out of client spaces. — New drainage runs Birmingham Airport is seeking to appoint a Construction Manager to identify the optimum phased packages of work necessary to deliver the construction of the Terminal Extension 3 (TE18) Project, to lead in the procurement of these work packages on behalf of the Airport and to manage the delivery of the work packages so as to ensure that the Project is delivered to time, cost and quality. The scope of the TE18 project is, in summary the construction of a new three storey extension to the existing terminal building, circa 10 000 m2. The works comprise: — Demolition of existing slabs and structures as required for the works — All groundworks and provision of new foundations as required by the design — Installation of new structural frame, cladding and roofing works. — Installation of Mechanical, electrical and public health systems. Integration of these systems with the Airport’s wider MEP systems where specified. — Internal fit out of client spaces. (Shop fitting shall be undertaken by the individual retailers and is excluded from the scope of this tender). — New drainage runs — The replacement of all life expired check-in related baggage handling system (BHS) mechanical electrical, and control equipment, and associated software platform(s) in support of upgrades to the BHS that are currently being undertaken. — Early/Compressed Build Baggage store in the North terminal. The works will include the installation new baggage handling system (BHS) mechanical, electrical, and control equipment, and associated software platforms necessary to permit the new additional sortation capacity to operate effectively. This is in support of upgrades to the BHS that are currently being undertaken In addition, the Construction Manager shall allow for the following requirements: — Phasing of works as necessary to limit disruption to Airport operations. — Design of temporary works where required. — BIM level 2. The Construction Manager will be expected to comply with the requirements of the BIM Execution Plan (see appendix 1). The following works will be completed by an enabling works contractor and are excluded from the scope of this tender: — Construction of new build extension re-provide bussing lounge capacity lost to TE18 — Provision of alternative route for Common Travel Passengers — Refurbishment of existing ‘Champagne Bar’ toilets — Reconfiguration of existing bussing lounge — Removal and relocation of existing diesel tank — New staircase 45 It should be noted that the project is located Airside: All Construction Manager’s staff will be required to undergo security clearance. The security vetting process will be managed by the Construction Manager. The appointed Construction Manager will be required to enter into an NEC3 contract with the Airport.
Timeline
- Completed: Tender published10 August 2018Current notice
- Completed: Submission date31 August 2018
About the buyer
Birmingham Airport Ltd is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 71500000 · Construction-related services
- 71540000 · Construction management services
- 71541000 · Construction project management services
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@birmingham-airport-ltd.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@birmingham-airport-ltd.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@birmingham-airport-ltd.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@birmingham-airport-ltd.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@birmingham-airport-ltd.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@birmingham-airport-ltd.gov |
33 similar open tenders
See more open tenders related to Construction management services.
- Open tender
Property QUDM
- Open tender
DPS for Interim Remediation Works
Related buyers
Buyers similar to Birmingham Airport Ltd.
- 392£10.0bn
- 105£763.1m
- 95£6.3m
- 78£866.9m
- 73£195.3m
- 48£82.5m
- 44£9.2m
- 44£28.5m
- 41£174.1m
- 36£29.2m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.