Stale Pre-tender

Kerbstones

Details

Value
GBP 3,000,000
Topic
Kerbstones
Published
19 July 2018

Tender description

With the aim being to undertake work during the Spring of 2019, this preferred start date is intended to allow for all kerb fixings and corrosion remedial works to be completed ahead of separate resurfacing work planned for 2020/21. Following close monitoring of the existing 7200 Kerb Units (4 studs per kerb unit) and the associated Deck Waterproofing System over recent years, since their initial installation, as part of the strengthening and widening scheme around the turn of the century, and following the identification of serious deterioration, a number of technical solutions were developed and tested and the preferred solution going forward is described as below: The main activities anticipated are listed as follows: Remove and retain existing kerb units for re-use; Remove existing mild steel holding down studs, clean and shot blast bridge deck to remove corrosion; Undertake Plate testing (MPI) and, if necessary, undertake Weld repairs; Weld new stainless steel holding down studs to the prepared bridge deck; Undertake Weld Test; Prime and waterproof bridge the deck with a high performance waterproofing system; Reinstate kerb units and fix down using new stainless steel fixings; Make good to all Drainage connections, with all of these aforementioned activities requiring strict associated Traffic Management control. It is anticipated that the work may last for a duration of up to 12 months, from the proposed contract commencement date of 1.4.2019. Interested Contractors are invited to request a copy of the trial documentation for information, via the Portal, as this is likely to be of assistance in helping them to determine if they can offer the same or a similarly durable and cost effective solution and encourage a tendered submission in due course. However, no information taken or implied from this trial report and the supporting information documents shall necessarily be deemed acceptable for incorporation in the proposed works and the Council reserves the right to impose contractual terms and specifications that may not be satisfied by these means. It is anticipated the form of Contract will be NEC Option A, with an associated Activity Schedule. The Procurement process is expected to be an Open Invitation to Tender exercise and, within the duration of that process, prospective bidders will be invited to attend an appropriately scheduled Contractor Information Event, at the Bridge, to help familiarize themselves with local conditions, any potential operational constraints and ask any questions of the Bridge Engineering Manager and his Technical Support colleagues.

Timeline

  1. Completed: Pre-tender published19 July 2018
    Current notice

About the buyer

Cornwall Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 44912400 · Kerbstones

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Kerbstones, ranked by notice volume.

View all topics

Related buyers

Buyers similar to Cornwall Council.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.