Specification for Technical Consultancy Support for Solar Farm Development HBC's Greening Derelict, Underused and Neglected (DUN) Land Demonstrator Project (subject to planning permission)
Details
- Published
- 26 March 2018
- Submission
- 17 April 2018
- Source
- uk:procontracts
Tender description
Halton Borough Council successfully bid for European Regional Development funding under ‘Priority Axis 4a – Promoting the production and distribution of energy derived from renewable resources’. The resulting Halton Borough Council’s Greening Derelict, Underused and Neglected (DUN) Land Demonstrator Project is seeking to develop a solar farm on a former brownfield site, a former golf course built on a capped landfill site (See Appendix A – St Michael’s Golf Course Map). The site is owned by the Council and is located south of the A562. The estimated maximum capacity of solar farm installation is initially 1MW but in time may be further developed. A generation connection of the Solar Farm to the Select Security Stadium has been obtained from Scottish Power Energy Network’s (SPEN). The new HV (High Voltage) Point of Supply (PoS) will be at a new HV substation to be located adjacent to the existing combined SPEN/customer substation building in the car park at the stadium. A new 800kVA transformer at the Stadium will provide the Stadium with an LV (Low Voltage) supply. A private wire 11kV cable will connect the solar PV site back to the stadium. It is important to note that this project is funded by the European Union using ERDF (European Regional Development Fund) and you will be required to complete and submit a range of monitoring and output forms as required by the funders. To view the full specification and requirement, please register your interest in this opportunity. All questions must be raised via the messaging facility with in the Chest. Closing date for questions is Thursday 12th April 2018 at 4pm. Closing date for submissions is Tuesday 17th April 2018 at 4.30pm. QUESTIONS relating to this document must be submitted via The Chest’s Messaging facility only and telephone calls will not be answered during the live process . Please refer to previously asked questions before asking a question as duplicate questions will not be answered. Both questions and answers will either be made public on The Chest or responded to directly to the originator depending on the content. Keywords: solar farm, planning
Timeline
- Completed: Tender published26 March 2018Current notice
- Completed: Submission date17 April 2018
About the buyer
Halton Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@halton-borough-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@halton-borough-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@halton-borough-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@halton-borough-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@halton-borough-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@halton-borough-council.gov |
Related topics
Topics related to Specification for Technical Consultancy Support for Solar Farm Development HBC's Greening Derelict, Underused and Neglected (DUN) Land Demonstrator Project (subject to planning permission), ranked by notice volume.
- 11,175£1.0tn
- 26,970£1.7tn
- 4,088£269.5bn
- 3,593£717.5bn
- 4,068£249.4bn
Related buyers
Buyers similar to Halton Borough Council.
- 1,016£964.6m
- 876£688.0m
- 818£1.7bn
- 760£14.1bn
- 730£153.0m
- 659£1.1bn
- 656£1.4bn
- 569£18.6bn
- 538£266.4m
- 532£2.8bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.