Awarded contract

Electricity

Details

Topic
Electricity
Published
1 March 2017

Tender description

A separate Interim Framework Agreement for DS3 System Services is being put in place for both EirGrid (as contracting entity for the Interim Framework Agreement applicable to Ireland) and SONI (as contracting entity for the Interim Framework Agreement applicable to Northern Ireland). The Services are split into a number of lots for each of the TSOs as follows: — Lots 1IE — 11IE relate to the System Services required by EirGrid. — Lots 1NI — 11NI relate to the System Services required by SONI. The requirements of each Service are detailed in the draft Interim Framework Agreements and in the relevant Grid Codes (see below links) as applicable. http://www.eirgridgroup.com/site-files/library/EirGrid/GridCodeVersion6.pdf http://www.soni.ltd.uk/media/documents/Operations/Grid-Code/SONI%20Grid%20Code%20Version%20Aug%202015.pdf Primary Operating Reserve or ‘POR’ has the meaning given to it in the Grid Code. Secondary Operating Reserve or ‘SOR’ has the meaning given to it in the Grid Code. Tertiary Operating Reserve 1 or ‘TOR1’ has the meaning given to it in the Grid Code. Tertiary Operating Reserve 2 or ‘TOR2’ has the meaning given to it in the Grid Code. RR (De-synchronised) means Replacement Reserve provided by the Providing Unit whilst it is De- synchronised or disconnected from the Power System. RR (Synchronised) means Replacement Reserve provided by the Providing Unit whilst it is Synchronised or connected to the Power System. Steady-State Reactive Power or ‘SSRP’ means Reactive Power Capability (Leading) and Reactive Power Capability (Lagging). Synchronous Inertial Response (SIR) is the Kinetic Energy (at a Frequency of 50Hz) of a Centrally Dispatched Synchronous Providing Unit multiplied by the SIR Factor (SIRF). Ramping Margin 1 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within one hour of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest Availability in that three hour period. Ramping Margin 3 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within three hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further five hours after the three hour period has elapsed. It is limited by the lowest Availability in that eight hour period. Ramping Margin 8 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within eight hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further eight hours after the eight hour period has elapsed. It is limited by the lowest Availability in that sixteen hour period. Primary Operating Reserve or ‘POR’ has the meaning given to it in the Grid Code. Secondary Operating Reserve or ‘SOR’ has the meaning given to it in the Grid Code. Tertiary Operating Reserve 1 or ‘TOR1’ has the meaning given to it in the Grid Code. Tertiary Operating Reserve 2 or ‘TOR2’ has the meaning given to it in the Grid Code. RR (De-synchronised) means Replacement Reserve provided by the Providing Unit whilst it is De- synchronised or disconnected from the Power System. RR (Synchronised) means Replacement Reserve provided by the Providing Unit whilst it is Synchronised or connected to the Power System. Steady-State Reactive Power or ‘SSRP’ means Reactive Power Capability (Leading) and Reactive Power Capability (Lagging). Synchronous Inertial Response (SIR) is the Kinetic Energy (at a Frequency of 50Hz) of a Centrally Dispatched Synchronous Providing Unit multiplied by the SIR Factor (SIRF). Ramping Margin 1 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within one hour of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further two hours after the one hour period has elapsed. It is limited by the lowest Availability in that three hour period. Ramping Margin 3 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within three hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further five hours after the three hour period has elapsed. It is limited by the lowest Availability in that eight hour period. Ramping Margin 8 is the increased MW Output and/or MW Reduction that a Providing Unit can provide to the Company within eight hours of the Company issuing a Dispatch Instruction to a Service Provider and that the Providing Unit can maintain for a further eight hours after the eight hour period has elapsed. It is limited by the lowest Availability in that sixteen hour period.

Timeline

  1. Completed: Award published1 March 2017
    Current notice

About the buyer

EirGrid plc is a public sector buyer in Ireland publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 09310000 · Electricity

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

Related topics

Topics related to Electricity, ranked by notice volume.

View all topics

Related buyers

Buyers similar to EirGrid plc.

View all buyers

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.