Adam Bridge, No. 0022, Wigan – Major Structural Maintenance Works -2017
Details
- Published
- 21 August 2017
- Submission
- 14 September 2017
- Source
- uk:procontracts
Tender description
Adam Bridge is situated approximately one kilometre north west of Wigan town centre where A49 splits up and Ormskirk Road crosses River Douglas taking outbound traffic travelling in westerly direction from town centre. Adam Bridge carries the A49 Ormskirk Road over the River Douglas. Grid reference: 357118 (E), 405156 (N) The site location is illustrated in the attached location plan. This bridge under the carriageway is simply supported Precast Pre-stressed concrete inverted ‘T5’ beams with insitu infill concrete deck . The pipe bays under the footways and stringcourses are supported by concrete encased steel universal beams The concrete bridge abutments are carried by 500mm. diameter reinforced concrete bored insitu piles. Bridge parapets consist of solid masonry stones reused from the original bridge. Stone river training wall exists on upstream and downstream sides of the bridge except in the north east corner on upstream side where river embankment exists. The road over the bridge is a four-lane one way carriageway. The works will be phased so that temporary restricted running shall be arranged and implemented by the Contractor. The structural maintenance works comprises: Exposing the concrete on the steel bridge deck under the carriageway, prepare this surface to accept replacing the bridge buried joints, re-waterproofing of the bridge deck and road resurfacing works. Keywords: Structural Maintenance
Timeline
- Completed: Tender published21 August 2017Current notice
- Completed: Submission date14 September 2017
About the buyer
Wigan Metropolitan Borough Council is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@wigan-metropolitan-borough-council.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@wigan-metropolitan-borough-council.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@wigan-metropolitan-borough-council.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@wigan-metropolitan-borough-council.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@wigan-metropolitan-borough-council.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@wigan-metropolitan-borough-council.gov |
Related topics
Topics related to Adam Bridge, No. 0022, Wigan – Major Structural Maintenance Works -2017, ranked by notice volume.
- 1,745£636.1bn
- 11,175£1.0tn
- 26,970£1.7tn
- 22,980£1.8tn
Related buyers
Buyers similar to Wigan Metropolitan Borough Council.
- 1,065£982.5m
- 900£690.3m
- 868£1.7bn
- 791£14.1bn
- 753£154.3m
- 712£1.1bn
- 667£1.4bn
- 577£22.6bn
- 545£2.9bn
- 538£266.4m
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
