Electricity distribution
Details
- Topic
- Electricity distribution
- Published
- 24 July 2017
- Submission
- 25 August 2017
- Source
- TedNotices
Tender description
Constraint Managed Zones — Pre-Qualification. Scottish and Southern Electricity Networks (SSEN) build and operate networks to best meet customer needs using the most efficient and flexible techniques possible. This is why we have introduced Constraint Managed Zones (CMZ) into our every day network operations. SSE is seeking proposals for CMZ services for Bramley, Andover and Tatcham. A CMZ is a geographic region served by an existing network, where network requirements related to network security of supply are met through the use of flexible services, such as DSR (Demand Side Response), Energy Storage and Stand-by Generation. CMZ techniques do not seek to increase capacity but will reduce or time-shift demand to avoid capacity constraints. Since capacity constraints only occur at periods of maximum demand, and only if an outage coincides, CMZ techniques need only be available during pre-defined service windows. Should a CMZ technique require a new electrical Point of Connection to the SSEN network, the CMZ supplier should make a separate application following the normal connection application request if successful in the Pre-Qualification Questionnaire. SSE is seeking proposals for CMZ services for Coxmoor Wood. A CMZ is a geographic region served by an existing network, where network requirements related to network security of supply are met through the use of flexible services, such as DSR (Demand Side Response), Energy Storage and Stand-by Generation. CMZ techniques do not seek to increase capacity but will reduce or time-shift demand to avoid capacity constraints. Since capacity constraints only occur at periods of maximum demand, and only if an outage coincides, CMZ techniques need only be available during pre-defined Service windows. Should a CMZ technique require a new electrical Point of Connection to the SSEN network, the CMZ supplier should make a separate application following the normal connection application request if successful in the Pre-Qualification Questionnaire. SSE is seeking proposals for CMZ services for Drayton, Milton. A CMZ is a geographic region served by an existing network, where network requirements related to network security of supply are met through the use of flexible services, such as DSR (Demand Side Response), Energy Storage and Stand-by Generation. CMZ techniques do not seek to increase capacity but will reduce or time-shift demand to avoid capacity constraints. Since capacity constraints only occur at periods of maximum demand, and only if an outage coincides, CMZ techniques need only be available during pre-defined Service windows. Should a CMZ technique require a new electrical Point of Connection to the SSEN network, the CMZ supplier should make a separate application following the normal connection application request if successful in the Pre-Qualification Questionnaire.
Timeline
- Completed: Tender published24 July 2017Current notice
- Completed: Submission date25 August 2017
About the buyer
Scottish and Southern Electricity is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.
Relevant CPV codes
- 65310000 · Electricity distribution
Decision makers
Connect with the people behind this procurement.
| Contact name | Job title | Phone number | Work email |
|---|---|---|---|
| Head of Procurement | +44 •••• •••••• | ••••••••@scottish-and-southern-electricity.gov | |
| Commercial Director | +44 •••• •••••• | ••••••••@scottish-and-southern-electricity.gov | |
| Procurement Manager | +44 •••• •••••• | ••••••••@scottish-and-southern-electricity.gov | |
| Category Lead | +44 •••• •••••• | ••••••••@scottish-and-southern-electricity.gov | |
| Senior Buyer | +44 •••• •••••• | ••••••••@scottish-and-southern-electricity.gov | |
| Contracts Manager | +44 •••• •••••• | ••••••••@scottish-and-southern-electricity.gov |
10 similar open tenders
See more open tenders related to Electricity distribution.
- Open tender
Flexibility Services
- Open tender
Flexibility Services
- Open tender
Customer Flexibility Services
- Open tender
Electricity
Related topics
Topics related to Electricity distribution, ranked by notice volume.
- 2,507£313.9bn
Related buyers
Buyers similar to Scottish and Southern Electricity.
- 128£849.0m
- 79£104.4m
- 74£3.3bn
- 70£2.5bn
- 63£3.3bn
- 42£31.2m
- 42£11.2bn
- 35£137.6m
- 32£4.1bn
- 28£1.4bn
Win more public sector contracts
Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.
