Expired contract

Support for assessment of Hitachi-GE Human Based Safety

Details

Value
GBP 84,612
Duration
6 months
Topic
Research and development services and related consultancy services
Published
10 July 2015

Tender description

1.1 In January 2014 ONR formally started Step 2 of the Generic Design Assessment (GDA) of Hitachi General Electric’s (Hitachi-GE) UK Advanced Boiling Water Reactor (UK ABWR). Hitachi-GE is the Requesting Party for the UK ABWR GDA (referred to as “the RP” in this specification). 1.2 Step 2 involved an overview of the acceptability, in accordance with the regulatory regime of Great Britain, of the design fundamentals, including review of key nuclear safety and nuclear security claims with the aim of identifying any fundamental safety or security shortfalls that could prevent the issue of a Design Acceptance Confirmation (DAC) (see http://www.onr.org.uk/new-reactors/ngn03.pdf). 1.3 During Step 2, ONR reviewed the key human-based safety claims (HBSC) or assertions put forward by the RP in the area of human factors (HF). These claims require modern standards substantiation in the RP’s safety case in a logical structure of claims, arguments and evidence and in a manner that is proportionate to their risk. ONR’s technical assessment report for the HF assessment work done during Step 2 and key conclusions are published on ONR’s website (http://www.onr.org.uk/new-reactors/uk-abwr/reports.htm). 1.4 ONR commenced Step 3 of GDA on 1st September 2014 and expects to complete this stage at the end of August 2015. GDA Step 4 is therefore intended to start on 1st September 2015 with completion scheduled for the end of 2017. 1.5 Substantiation of HBSC and the associated human reliability analysis is a key activity in the design of the new plant. It provides input and is informed by a number of cross-cutting areas such as: fault studies regarding the identification of claims and feasibility of any operator actions, verification of function allocation and input to the Probabilistic Safety Analysis (PSA) to enable a best-estimate risk to be evaluated, demonstrate whether a balanced design has been achieved, and to identify areas where the human-contribution to plant risk may be dominant and further reasonably practicable design improvements and re-allocation of function may be needed. 1.6 Hitachi-GE’s submissions to ONR that seek to provide the HBSC substantiation will be phased during Steps 3 and 4 of GDA and will provide increasing detail and evidence as the design and safety case develops and is finalised. During Steps 3 and 4 of GDA, ONR will undertake assessments of increasing detail, to confirm that the claims are supported by an adequate body of arguments (reasoning) and evidence. During Step 4 in particular, ONR will continue its assessment but with increased focus on the evidence, conducting in-depth reviews, on a sampling basis, of the RP’s HF substantiation and reliability analysis for the UK ABWR HBSC. The outcome of this is to confirm and have sufficient confidence that the HBSC are supported by cogent arguments that are underpinned by robust evidence.

Timeline

  1. Completed: Award date9 June 2015
  2. Completed: Award published10 July 2015
    Current notice
  3. Completed: Contract expiry date15 December 2015

About the buyer

Department For Work and Pensions (DWP) is a public sector buyer in United Kingdom publishing tenders and awards on Stotles. Explore their procurement activity and find more opportunities like this one.

Relevant CPV codes

  • 73000000 · Research and development services and related consultancy services

AI insights

  • Is there a preferred supplier?
  • What are the buyers pain points?
  • What has the buyer previously procured?
  • What are the key requirements?
Sign-up to enrich

Decision makers

Connect with the people behind this procurement.

Contact nameJob titlePhone numberWork email
Head of Procurement+44 •••• ••••••
Commercial Director+44 •••• ••••••
Procurement Manager+44 •••• ••••••
Category Lead+44 •••• ••••••
Senior Buyer+44 •••• ••••••
Contracts Manager+44 •••• ••••••

34 similar open tenders

See more open tenders related to Support for assessment of Hitachi-GE Human Based Safety.

Explore all open tenders

Related topics

Topics related to Support for assessment of Hitachi-GE Human Based Safety, ranked by notice volume.

View all topics
TopicCountValue
  1. 1,745
    £636.1bn

Win more public sector contracts

Track every UK and Ireland tender in one place — set up alerts, find decision-makers, and never miss an opportunity.