Lot 1 - Larger scale transmission substations
Lot 1 - Larger scale transmission substations : c. £25m to 100m (400/275/110 kV)
It is proposed to establish a Multi-Party Framework which will consist of two lots, • Lot 1 will consist of larger scale substations with a range between 110 – 400kV and an estimated cost range between £25 to £100m. • Lot 2 will consist of medium scale substations with a range between 33 – 275kV and an estimated cost range between £1 - £25m • The scope of works to be procured will include predominantly substation works including turnkey electrical, mechanical, civils and enabling works, with the inclusion of local overhead lines and cables within the curtilage of the site. • NIEN wish to retain the flexibility for each lot to utilise both Design and Build (D&B) and Engineering Procurement and Construction (EPC) models. • The default approach will be that equipment supply (transformers and switchgear etc.) will be in the scope of projects. Free issue of equipment will be limited to those projects for which NIEN have equipment ordered.
6 suppliers across 2 lots
Lot 1 - Larger scale transmission substations : c. £25m to 100m (400/275/110 kV)
Lot 2 - Medium scale substation works c. £1m - £25m ( 275/110/33 kV)
Buyers and suppliers active on the T322 NIEN Transmission Substation Turnkey framework, ranked by contract award volume.
Suppliers ranked by total contract award volume through T322 NIEN Transmission Substation Turnkey.
Buyers ranked by total contract award volume through T322 NIEN Transmission Substation Turnkey.