Pre Market Engagement for Adaptations Framework
Bolton at Home have invited tenders for the provision of Adaptations Framework, split down into categories of works under Lots:- Lot 1 - Adapted Bathrooms, Lot 2 - Adapted Extensions, Lot 3 - Minor Adaptations, Lifts, Lot 4 - Concrete Ramps, Lot 5 - Metal Ramps, Lot 6 - Lifts, Lot 7 - Stairlifts. Bolton at Home is seeking to award a contract to a minimum of 2 up to a maximum of 20 suppliers per Lot. Tender Framework Term will be for 4 years. The contract will be awarded based on the most economically advantageous tender (MAT) and the evaluation criteria is as follows:- Stage 1 - Quality inc Social Value - 50% Stage 2 - Pricing - 50% Stage 3 - Procurement Specific Questionnaire - Pass/Fail
Timeline
- Contract start date23 July 2025
- Tender published24 July 2025
- Submission date1 August 2025
- Award published27 November 2025
- Contract expiry date31 October 2029in 3 years
Lots (7)
92 suppliers across 7 lots
Adapted Extensions
Lot 2 - Adapted Extensions (Annual Average Order Value £30,000 Average No of Jobs c.10) • Extensions inc necessary groundwork (pilling/underpinning) • Level Access Showers, Chair/Seat, WC & Basin • Wet Room • Wet Room Flooring • Full Bathroom Adaptations • Widening Doorways • Carpentry & Joinery Services • Brickwork & Masonry Services • Concrete Work • Plastering • Damp proof course related work • Floor and wall finishes • General Plumbing work • General Electrical work • Fencing and gate repairs • Framework welding and fabrication • Glazing repairs • UPVC window renewal/repair • Roofing • And any other installations required
Minor Adaptations
Lot 3 - Minor Adaptations (Internal & External) (Annual Average Order Value £250 Average No of Jobs c.548) • Half Steps • Full Steps • Handrails • Grabrails • Stair Rails • Raised Toilet Seats • Shower Seats & Rails • And any other installations required
Concrete Ramps & Hardstanding
Lot 4 - Concrete Ramps & Hardstanding (Annual Average Order Value £7,500 Average No of Jobs c.44) • Concrete Ramps • Hardstanding • And any other installations required
Metal Ramps
Lot 5 - Metal Ramps (Annual Average Order Value £2,000 Average No of Jobs c.10) • Metal Ramps • And any other installations required
Through Floor & Step Lifts
Lot 6 - Through Floor and Step Lifts (Annual Average Order Value £10,500 Average No of Jobs c.12) • Through Floor Lifts • Step Lifts • And any other installations required
Stairlifts
Lot 7- Stairlifts (Annual Average Order Value £4,380 Average No of Jobs c.175) • Stairlifts • And any other installations required
Framework analysis
Buyers and suppliers active on the Pre Market Engagement for Adaptations Framework framework, ranked by contract award volume.
Top suppliers associated with Pre Market Engagement for Adaptations Framework
Suppliers ranked by total contract award volume through Pre Market Engagement for Adaptations Framework.
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
- 1£460.9k
Top buyers associated with Pre Market Engagement for Adaptations Framework
Buyers ranked by total contract award volume through Pre Market Engagement for Adaptations Framework.
- 3£37.8m
Ready to get started?
From first signal to bid submission, Stotles turns procurement chaos into predictable pipeline.
