Planned Investment and Building Safety Framework

The new framework contains both active and passive fire protection contractors. Active fire protection means fire detecting and fore stopping equipment such as fire alarms and sprinklers. Passive fire protection means equipment to contain a fire or to prevent further spread, so things like fire doors and compartmentation. The contractors who have been selected for the new framework are listed below with their area of expertise.

Timeline

  1. Tender published11 January 2022
  2. Submission date11 February 2022
  3. Award published25 May 2023
  4. Contract start date3 July 2023
  5. Contract expiry date3 July 2027in 10 months

Lots (6)

13 suppliers across 6 lots

Planned Investment Works - Building Envelope and Communal Spaces

The scope of works for contracts placed under this Lot, includes but is not limited to, external and internal redecorations to communal hallways, roof repairs and roof renewals, roof and cavity insulation, window repairs and replacement, door repairs and replacement, structural repairs to steps, balconies, fencing & walls, Housing Health and Safety Rating Scheme (HHSRS) associated works along with internal works to communal areas including floor coverings, fire risk remedial works and low energy lighting.

Planned Investment - Kitchens and Bathrooms

Contract placed under this Lot will typically involve the replacement programmes for domestic kitchen and bathroom works. This will mainly comprise of removal and installation of the existing kitchen, or bathroom, or both, internal redecorations, electrical testing and remedial works, minor remedial and damp proofing works, tiling and vinyl flooring.

Building Safety - Cladding Remediation & Wider Capital Works

Contracts issued under this Lot will allow NHG to appoint contractors to support in NHG's Building Safety programme. This lot will focus on the replacement of deficient external wall systems including but not limited to removing combustible materials and reinstating non-combustible materials and replacing defective fire barriers. This lot may also include the delivery of wider capital works such as those covered by Lot 1A and Lot 1B and Fire Risk Assessment remedial works.

Building Safety - Cladding Remediation Only

Contracts placed under this Lot will allow NHG to appoint contractors to support in NHG's Building Safety programme. This lot will focus solely on the replacement of deficient external wall systems including, but not limited to, removing combustible materials and reinstating non-combustible materials, replacing defective fire barriers and all other associated works.. This lot will not incorporate wider capital works.

Fire Risk Assessment Remediation Works - Passive Fire Safety

7 suppliers

Contracts placed under this Lot will specifically relate to passive fire safety works. This will include, but not be limited to, maintenance, repair and/or improvement of the building to address any breaches in compartmentation. This would normally include installation of and/or repairs to doors, installation of fire safety signage (including wayfinding signage), filling penetration breaches and introducing additional compartmentation in void spaces such as lofts and service riser cupboards where recommended by our fire risk assessors

Fire Risk Assessment Remediation Works - Passive Fire Safety

6 suppliers

Contracts placed under this Lot will specifically relate to active fire safety works. This will include, but not be limited to, major improvements and/or installations of fire safety equipment (such as fire detection systems, automatic opening vents etc), installations and maintenance of emergency lighting to meet statutory requirements or to address a risk/hazard identified by our fire risk assessors.

Framework analysis

Buyers and suppliers active on the Planned Investment and Building Safety Framework framework, ranked by contract award volume.

Top suppliers associated with Planned Investment and Building Safety Framework

Suppliers ranked by total contract award volume through Planned Investment and Building Safety Framework.

Top buyers associated with Planned Investment and Building Safety Framework

Buyers ranked by total contract award volume through Planned Investment and Building Safety Framework.

BuyersCountValue
  1. 2
    £1.9bn

Ready to get started?

From first signal to bid submission, Stotles turns procurement chaos into predictable pipeline.