Modern Methods of Construction New Homes

This framework has been developed to provide an efficient, value for money procurement route for local authorities, social landlords and other public sector bodies for the offsite development of new residential buildings using modern methods of construction (MMC). This framework agreement can be used for: General housing Apartments (including student accommodation and care homes) Adaptive pods Room on the roof projects Temporary accommodation Enhanced energy performance and net zero carbon projects Groundworks for offsite projects

Timeline

  1. Tender published21 July 2022
  2. Submission date14 October 2022
  3. Award published4 May 2023
  4. Contract start date4 May 2023
  5. Contract expiry date3 May 2027in 8 months

Lots (20)

46 suppliers across 20 lots

3 Dimensional Modular SystemsLow Rise Housing and Apartments up to 11m floor height - 0-9 Units

6 suppliers

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

3 Dimensional Modular Systems Low Rise Housing and Apartments up to 11m floor height - 10-19 Units

4 suppliers

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

3 Dimensional Modular SystemsLow Rise Housing and Apartments up to 11m floor height - 20-49 Units

3 suppliers

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

3 Dimensional Modular Systems Low Rise Housing and Apartments up to 11m floor height - 50 units and over

2 suppliers

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

3 Dimensional Modular Systems High Rise Housing 11m floor height or higher

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

3 Dimensional Modular Systems Independent and Assisted Housing and Care Homes

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

3 Dimensional Modular Systems Adaptive Pods

A systemised approach based on volumetric construction involving the production of three-dimensional units in controlled factory conditions prior to the final installation. Volumetric units can be brought to site in a variety of forms ranging from a basic structure to one with all internal and external finishes and services installed. This workstream also allows for the installation of volumetric units and includes low rise housing, high rise housing, independent and assisted housing, care homes and adaptive pods.

2D Panelised Systems Supply Only

3 suppliers

A systemised approach using flat panel units used for basic floor, wall and roof structures of varying materials which are produced in a factory environment and assembled by the workforce to produce a three-dimensional structure. The most common approach is to use open panels, or frames which consist of a skeletal structure only with services, insulation, external cladding and internal finishing being installed on-site. There is a supply only lot and a supply and installation lot for panelised systems such as timber, light gauge steel frames and structural insulated panels (SIPS) or other alternatives

2D Panelised Systems – Installers

A systemised approach using flat panel units used for basic floor, wall and roof structures of varying materials which are produced in a factory environment and assembled by the workforce to produce a three-dimensional structure. The most common approach is to use open panels, or frames which consist of a skeletal structure only with services, insulation, external cladding and internal finishing being installed on-site. There is a supply only lot and a supply and installation lot for panelised systems such as timber, light gauge steel frames and structural insulated panels (SIPS) or other alternatives

2D Panelised Systems Supply and Install

5 suppliers

A systemised approach using flat panel units used for basic floor, wall and roof structures of varying materials which are produced in a factory environment and assembled by the workforce to produce a three-dimensional structure. The most common approach is to use open panels, or frames which consist of a skeletal structure only with services, insulation, external cladding and internal finishing being installed on-site. There is a supply only lot and a supply and installation lot for panelised systems such as timber, light gauge steel frames and structural insulated panels (SIPS) or other alternatives

Main Contractors Low Rise Housing and Apartments up to 11m floor height - 0-9 Units

3 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Main Contractors Low Rise Housing and Apartments up to 11m floor height - 10-19 Units

1 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Main Contractors Low Rise Housing and Apartments up to 11m floor height - 20-49 Units

1 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Main Contractors Low Rise Housing and Apartments up to 11m floor height - 50 units and over

1 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Main Contractors High Rise Housing - 11m or Higher

1 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Main Contractors Care Homes and Specialised Housing

2 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Main Contractors Room on the Roof

1 suppliers

This workstream for main contractors focuses on organisations that provide MMC solutions and principal contractor services to deliver all scopes of a construction project including design, manufacturing, groundworks, installation (sub and super structure), handover and post construction. This also includes the ability for an organisation to supply through either an internal manufacturing facility, nominated third party or another organisation awarded on the framework supplying all MMC categories. This workstream includes low rise housing, high rise housing, care homes, other specialised housing and room on the roof projects.

Groundworks and Associated Works

1 suppliers

This workstream allows flexibility for a client to select a groundworks contractor working in combination with workstreams 1 and 2 with the view of completing all site preparation and clearance and substructure works with a separate contractor to complete superstructure works.

Workstream 1 3D Modular Low Rise Housing Super Lot

7 suppliers

A super lot is in operation for the following workstreams where a client may carry out a mini competition to all other companies within the workstream if they do not receive sufficient expressions of interest from those companies within their region (subject to restrictions)

Main Contractors Low Rise Housing Super Lot

5 suppliers

A super lot is in operation for the following workstreams where a client may carry out a mini competition to all other companies within the workstream if they do not receive sufficient expressions of interest from those companies within their region (subject to restrictions)

Framework analysis

Buyers and suppliers active on the Modern Methods of Construction New Homes framework, ranked by contract award volume.

Top suppliers associated with Modern Methods of Construction New Homes

Suppliers ranked by total contract award volume through Modern Methods of Construction New Homes.

Top buyers associated with Modern Methods of Construction New Homes

Buyers ranked by total contract award volume through Modern Methods of Construction New Homes.

BuyersCountValue
  1. 3
    £2.1bn