Lot 1
This procurement is to establish a single supplier Framework Agreement under which there will be Call-Offs for the supply, installation, testing, commissioning, and maintenance of Uninterruptable Power Supply & Central Battery Systems, primarily for the new Phase One Stations to be constructed at Euston, Old Oak Common, Birmingham Curzon Street and Interchange. These Uninterruptible Power Supply & Central Battery Systems may also be required and called off under the Framework Agreement as Optional Scope at other sites (see VI.3 below). The Framework Agreement is being established for use by the Phase One Station Contractors (Supply and Installation Call-Off Contract), HS2 Ltd and/or an appointed Infrastructure Manager, if applicable (Maintenance Call-Off Contract) and for use by other Contracting Bodies defined in VI.3 below (both Supply and Installation, and Maintenance Call Off Contracts). Further information on the procurement and on the scope (both Base and Optional), Contracting Bodies and anticipated timing and value of Call-Off Contracts is included in the PQP documents (including Heads of Terms and Outline Scope documents). Additional information: Applicants are referred to VI.3) Additional information in this Contract Notice below.