GR/HGW/Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Contract

Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Maintenance contract. The gully cleansing service includes cleansing of gullies on the public highway, including the footway, and checking their connections for free flow of water. Where the connection is slow running the connection shall be jetted and / or rodded as required to enable a free flow of water. In addition routine maintenance of the drainage systems located at various subways throughout the City of Bristol is required.

Timeline

  1. Tender published23 August 2024
  2. Submission date4 October 2024
  3. Contract start date31 March 2025
  4. Award published23 July 2025
  5. Contract expiry date31 March 2033in 7 years

Lots (1)

1 suppliers across 1 lots

Lot 1

1 suppliers

The contract will be let via open tender, with details of the evaluation criteria contained within the tender documents. The contract length will be for 8 years, with the option to extend for up to a further 4 years (2 x 24month extensions). The estimated value is £12million over the term (including extensions).

Framework analysis

Buyers and suppliers active on the GR/HGW/Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Contract framework, ranked by contract award volume.

Top suppliers associated with GR/HGW/Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Contract

Suppliers ranked by total contract award volume through GR/HGW/Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Contract.

Top buyers associated with GR/HGW/Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Contract

Buyers ranked by total contract award volume through GR/HGW/Gully Cleansing and Drainage Investigation, Survey, Maintenance and Repair Term Contract.

BuyersCountValue
  1. 2
    £16.0m

Ready to get started?

From first signal to bid submission, Stotles turns procurement chaos into predictable pipeline.