Cumberland Capital Works Framework 2025 - 2029
The Capital Works Framework is a structured approach for managing and delivering construction projects. It is designed to streamline the process and ensure efficient project execution. The framework focuses on delivering capital works across the Cumberland Council's diverse portfolio. Overview of the Authority's requirement: To undertake construction projects across various locations within Cumberland with an individual project budget of up to £6 million. The Council reserves the right to advertise projects exceeding this value if it considers it appropriate. The projects are divided into the following packages (Lots): • Lot 1: General Building Works • Lot 2: Civil Engineering Works • Lot 3: Combined Building and Civil Engineering Works The Council is seeking to award up to eight contractors for each lot. Contractors will be appointed as the principal contractor for each project. Contractors must ensure they have the necessary capabilities to perform the tasks described in each work package summary.
Timeline
- Tender published28 February 2025
- Submission date28 March 2025
- Contract start date30 September 2025
- Award published19 November 2025
- Contract expiry date29 September 2029in 3 years
Lots (3)
24 suppliers across 3 lots
Civil Engineering Works
Project Value Range: Up to £3 million Contractors are expected to undertake a variety of works including: • Structures & Bridges: This involves the repair and maintenance of highway structures, including retaining walls and bridges. Tasks may include culvert replacement, masonry arch bridge repairs, replacement of sections of retaining walls, and sea wall repairs. These structures are primarily made of stone or stone-faced materials, reinforced or mass concrete, or structural steelwork, and are most often located on carriageway local roads. • Public Realm: This includes improvements to town centre environments, likely involving highway surfacing, footpaths, drainage, and signage enhancements. Works may also include upgrades to the appearance and functionality of transport interchanges. • Highway Improvements: This involves improvements to junctions, access roads, car parks, and distributor routes to enhance safety and facilitate development. • Footpath/Cycleway Improvements: While some of these schemes may be procured through other Council frameworks (e.g., small value surfacing framework), larger schemes may be managed through this framework. • Drainage, Ground Stabilisation, and Flood Prevention Schemes: These schemes could include packages of several small drainage projects, piling, slope stabilisation, or slope protection schemes adjacent to highways. They may also encompass a variety of flood prevention initiatives.
Combined Building and Civil Engineering Works
Project Value Range: £2.5 million to £6 million but may be used to procure schemes above £6m (with no upper limit) based on complexity, risk and other considerations Contractors are expected to undertake a variety of works including similar projects to those outlined in Lots 1 and 2.
Framework analysis
Buyers and suppliers active on the Cumberland Capital Works Framework 2025 - 2029 framework, ranked by contract award volume.
Top suppliers associated with Cumberland Capital Works Framework 2025 - 2029
Suppliers ranked by total contract award volume through Cumberland Capital Works Framework 2025 - 2029.
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
- 1£35.0m
Top buyers associated with Cumberland Capital Works Framework 2025 - 2029
Buyers ranked by total contract award volume through Cumberland Capital Works Framework 2025 - 2029.
- 3£875.0m
Ready to get started?
From first signal to bid submission, Stotles turns procurement chaos into predictable pipeline.